Battery Installation - Train; Getting Started; Storage Tower - VTech Go Go Smart Wheels Train Station Playset User Manual

User manual
Table of Contents

Advertisement

STORAGE TOWER

1. Attach the storage tower
structure to its SmartPoint
track. You will hear a 'click'
sound to indicate the structure
is secure.
After the above steps, connect these pieces to the included track pieces.
You can configure them into different arrangements.

GETTING STARTED

BATTERY INSTALLATION - TRAIN

1. Make sure the unit is turned OFF.
2. Locate the battery cover on the bottom of the
unit. Use a screwdriver to loosen the screw.
3. Install 3 new AAA (AM-4/LR03) batteries
following the diagram inside the battery
box. (The use of new alkaline batteries is
recommended for maximum performance.)
4. Replace the battery cover and tighten the
screw to secure.
TM
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents