6. Finish ceiling work. Ceiling hole should be
aligned with the inside edge of the flange.
(Fig.4)
7. Remove the tape from mounting springs
before installation.(Fig.5)
8. Insert the grille mounting springs into slots
as shown and mount grille to fan body . (Fig.6)
1. Before installation, remove the tape from
damper and adaptor, and check that the
damper can open and close smoothly. Then
remove the accessory screws from suspension
bracket. (Fig.1 of page 5)
2. Fix the flange of frame to stud by 2 long
screws(ST4.2x30), and fix the suspension
bracket to stud by 2 long screws(ST4.2x30).
(Fig.7)
3. Complete the
wiring
step 3 to 5 of INSTALLATION on page 5.).
4. Finish the wall work. Wall hole should be
aligned with the inside edge of the flange.
(Fig.8)
5. Install the grille (Refer to step 7 to 8 of

INSTALLATION

.).
6
WALL
and
duct work
(Refer to
After finishing the ceiling job, fill gap between
flange and ceiling with caulk or other sealant to
prevent air leakage.
Tape
4 Long screws
(ST4.0 x 30)
Wall
Stub
Wall
After finishing the wall job, fill gap between
flange and wall with caulk or other sealant to
prevent air leakage.