System Documentation - NEC Express5800/320Fc Site Planning Manual

Nec servers site planning guide
Hide thumbs Also See for Express5800/320Fc:
Table of Contents

Advertisement

What are the lengths and types of the cables that will connect to your system?
Have you created a sketch of how you plan to arrange the system at the installation
site? Consider the available cable lengths, the placement of external devices, and
the location of network and voice communication connections.
On the sketch, show the following:
Location of the system and its external components
Power cords, and telephone and interface cables
Locations of AC power receptacles, phone jacks, Ethernet jacks, switches,
and/or hubs
N O T E
Make sure that all cords and cables are long enough to
reach between their respective components and
connectors. Route all cables out of the way of foot traffic.
Working with Other Groups
Have you provided your facilities group and contractors with the sketch and copies
of the following?
Tables 4-2, 4-3, and 4-4, worksheets for determining AC power requirements
Tables
number of external power outlets required
Appendix B, "Electrical Circuit and Wiring Information"
Any notes you have about site planning
Have you reviewed and discussed the requirements with the facilities personnel
and contractors to ensure that all site modifications are understood and
implemented?
If you have any questions about the number and types of components, contact your
Express5800/320Fc account executive or distributor.
Welcome to Site Planning for Express5800/320Fc systems
4-5
and
4-6
or Tables
4-7
and 4-8, worksheets for determining the

System Documentation

1-5

Advertisement

Table of Contents
loading

Table of Contents