MAINTENANCE

Disconnect electrical power and close the manual gas
shut off valve before performing maintenance or severe
personal injury may result!
Servicing, inspection and adjustment must be done by
a trained technician in accordance with all applicable
local and national codes. Improper servicing or
adjustment can damage the boiler/water heater!
Th e boiler/water heater must be cleaned and inspected at least once
a year and before each heating season. Make sure that the burner and
ignition components are free from dust, soot, dirt, corrosion or other
deposits that would impair the boiler/water heater 's performance.
Refer to Figure 20, page 28 for component identifi cation.
Improper burner servicing can result in premature
burner failure voiding the warranty!
Pilot and burner removal
1. Close the manual shutoff valves in the gas supply line and turn
off electrical power to the boiler/water heater.
2. Remove the jacket top panel.
3. Remove wires from the spark rods and remove the UV sensor
from the transition piece.
4. Remove the pilot assembly:
a. Disconnect the compression nut at the front of the pilot
block.
b. Remove the pilot gas tubing.
c. Remove the (2) screws from the pilot block.
d. Remove the pilot assembly.
5. Disconnect the fl exible gas line from the manifold.
6. Disconnect the wires to the fan and remove the (2) bolts and the
fan hold-down plates that secure the fan to the transition piece.
7. Lift and remove the fan housing from the boiler/water heater,
taking care not to damage the spark rods and or their alignment.
8. Remove the four nuts holding the transition piece to the heat
exchanger.
9. Remove the transition piece, taking care not to damage the
O-ring.
10. Remove the burner, taking care not to damage the gasket.
11. Replace all components aft er servicing.
Heat exchanger inspection
1. Close the manual shutoff valves in the gas supply lines and turn
off electrical power to the boiler/water heater.
2. Remove burner following the instructions in the Burner Removal
section.
30
Finned copper tube gas boilers & water heaters – Boiler Manual
F F
F
d
b
b l
3. Remove the front jacket panel and combustion chamber door.
4. Inspect the inside and outside of the heat exchanger
5. The outside surfaces of the copper tubes should be free of
6. If there are no signs of damage, sooting or corrosion, reassemble
7. A badly corroded or damaged heat exchanger must be replaced,
Heat exchanger cleaning
1. Close the shut off valves in the inlet and outlet piping. On heating
2. Disconnect the boiler/water heater from the system piping.
3. Remove the eight bolts on the rear pipe enclosure panel.
4. Remove the front jacket panel and combustion chamber door.
5. Slide the heat exchanger out of the unit.
6. Remove the "V" baffl e straps and "V" baffl es.
7. Thoroughly clean the heat exchanger with water from
8. Replace the cleaned heat exchanger and other components in
Heat exchanger repair & replacement
1. A leaking or otherwise damaged tube(s) can be replaced as
2. Remove the heat exchanger from the boiler/water heater as
3. Remove the pipe plugs from the inlet/outlet and return headers
4. Carefully cut the damaged tube(s) in half, taking care not to
5. Install and swage/expand in place the new tube(s).
&
h
B l M
for signs of damage, sooting or corrosion.
any soot deposits. A slight black smudge is normal with
some types of gases. Black soot indicates poor combustion.
Green deposits indicate condensation due to low return water
temperatures. In either case the heat exchanger must be cleaned
thoroughly and the problem resolved before the boiler/water
heater is returned to service.
the unit following the previous steps in reverse order.
see the Heat Exchanger Repair & Replacement section.
systems close the system fi ll valve and relieve the system pressure
from the boiler by carefully lift ing the relief valve or opening the
drain valve.
a high-pressure hose. Use a soft bristle brush if necessary.
the reverse order of their removal.
outlined in steps 2 through 8.
outlined in the Heat Exchanger Cleaning section.
opposite from the ends of the tube(s) being replaced.
damage the adjacent tubes and remove.