Drs Cluster Validity; Valid Drs Clusters - VMware vSphere ESXi 4.0 Management Manual

Hide thumbs Also See for vSphere ESXi 4.0:
Table of Contents

Advertisement

vSphere Resource Management Guide

DRS Cluster Validity

The vSphere Client indicates whether a DRS cluster is valid, overcommitted (yellow), or invalid (red).
DRS clusters become overcommitted or invalid for several reasons.
A cluster might become overcommitted if a host fails.
n
A cluster becomes invalid if vCenter Server is unavailable and you power on virtual machines using a
n
vSphere Client connected directly to an ESX/ESXi host.
A cluster becomes invalid if the user reduces the reservation on a parent resource pool while a virtual
n
machine is in the process of failing over.
If changes are made to hosts or virtual machines using a vSphere Client connected to an ESX/ESXi host
n
while vCenter Server is unavailable, those changes take effect. When vCenter Server becomes available
again, you might find that clusters have turned red or yellow because cluster requirements are no longer
met.
When considering cluster validity scenarios, you should understand these terms.
Reservation
Reservation Used
Unreserved
Table 6-1. Resource Pool Unreserved Numbers
Resource Pool Type
Nonexpandable resource pools
Expandable resource pools

Valid DRS Clusters

A valid cluster has enough resources to meet all reservations and to support all running virtual machines.
Figure 6-1
shows an example of a valid cluster with fixed resource pools and how its CPU and memory
resources are computed.
58
A fixed, guaranteed allocation for the resource pool input by the user.
The sum of the reservation or reservation used (whichever is larger) for each
child resource pool, added recursively.
This nonnegative number differs according to resource pool type.
Number Used
Reservation minus reservation used.
(Reservation minus reservation used) plus any unreserved
resources that can be borrowed from its ancestor resource
pools.
VMware, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esx 4.0Esxi 4.0Vcenter server 4.0

Table of Contents