Connecting The Unit To The Electricity Supply; Establishing The Mains Connection; Connecting Controllers, Accessories And External Installation Components - Vaillant ecoTEC exclusive 832 Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

b)
Connection into the domestic waste water drain
pipe (e.g. a sink or washing machine) with an exter-
nal termination.
The condensate drain pipe should have a minimum
diameter of 22 mm, without length restriction, and
also be fitted with a siphon (3) having a connection
head of 75 mm (fitted within the boiler already).
The connection should be made after the drain
siphon if possible. If the installation is only possible
in front of the siphon, there must be a ventilation
valve between the two siphons. This is normally
provided in a drain.
c)
Draining into a gully (5) under the grid (6) and
above the water level. The external piping should
be kept as short as possible to minimise the frost
risk, and should be no longer than 3 m.
d)
To the condensate absorption point (drainage
ditch) (7). The external pipe should have a maxi-
mum length of 3 m.
Further information can be obtained from "BS 6798
Specification for installation of gas–fired boilers of rated
input not exceeding 70 kW net". The condense trap (1)
must be filled with water as described in the relevant
chapter before the boiler is commissioned.
5.10

Connecting the unit to the electricity supply

e
Danger!
Risk of death from electric shock through
contact with live connections!
Mains connection terminals L and N remain
live even if the boiler main switch is turned
off.
> Always switch off the power supply first.
Only then may you out the installation.
5.10.1

Establishing the mains connection

The appliance is fitted with a 1.0 m long connection
cable with mains plug. The three-pole mains plug is fit-
ted with a 3.0 A fuse. The connection cable is wired into
the appliance in the factory.
Connection to the mains supply shall be made via the
fused 3 pin plug to an unswitched shuttered socket,
complying to the requirements of BS 1363.
Installation and maintenance instructions ecoTEC exclusive 0020017768_07
5.10.2 Connecting controllers, accessories and
external installation components
The following controllers, accessories and installation
components can be connected to the ecoTEC exclusive
(see Table 5.2).
The installation should be carried out in accordance with
the individual instruction manual. The required connec-
tions to the electronic system of the boiler (e.g. for
external controllers, external sensors etc.) should be
undertaken as follows:
> Remove the front cover of the device, and lower the
electronic box forward.
> Unclip the rear cover of the electronic box and hinge
the cover upwards.
> Insert the connection lines of the components to be
connected through the cable openings (1) on the left
hand side of the underside of the appliance.
> Then insert the connection lines through the cable
openings (2) into the electronic box and cut them to
length.
1
2
Fig. 5.12 Opening the switchgear box rear wall
Installation
5
21