lOCATION CONSIDERATIONS

1 . Install Unit Indoors: It is recommended that the Model 8100 ERV be mounted in a conditioned space . If the unit is mounted in an area where
the temperature may drop below 32°F or exceed 100°F, all duct work in the unconditioned space must be insulated .
2 . Mounting: The recommended mounting location is on the basement foundation wall, or a stud wall with easy access to the HVAC system .
The unit may also be mounted to basement ceiling joists .
3 . Mounting Kit: The unit must be mounted with the mounting kit provided .
4 . power: Outlet within 30" of unit .
5 . Service Clearances: Allow a minimum of 36" clearance around the access door . Allow for 12" of clearance to access duct connections, on/
off switch and wiring connections . (See figure 3 .)
fIGURE 3 – Dimensions and location Considerations
CEILING MOUNTING HOLES
WALL
MOUNTING
HOLES
6" ROUND
12-3/4"
COLLARS
20-9/16"
2"
12"
EXTERNAL CONTROL WIRING ACCESS
RETURN
STALE AIR
SUPPLY
FRESH AIR
2"
37-7/16"
SERVICE
CLEARANCE
CEILING MOUNTING HOLES
ON / OFF
SWITCH
MOUNTING
6" ROUND COLLARS
12"
36"
WALL
HOLES
90-1743
3