Miele KM 84-2 Operating Instructions Manual page 24

Ceramic
Table of Contents

Advertisement

Instructions for building-in
Instructions for building-in
2 zone Combiset
1 element
2 elements
3 elements
4 elements
5 elements
4 zone Combiset
1 elements
2 elements
3 elements
Combination
One 2 zone
+ one 4 zone
Two 2 zone
+ one 4 zone
Three 2 zone
+ one 4 zone
One 2 zone
+ two 4 zone
Two 2 zone
+ two 4 zone
Extractor (e.g. DA 8-2)
For building in between two appliances:
- Dimension B increases by 90 mm.
For building in at the end of a combination:
- Dimension B increases by 98 mm.
24
Depth
Width
in
(=
mm
Dimen-
sion B)
in mm
490
265
490
558
490
851
490
1144
490
1437
490
560
490
1143
490
1728
490
851
490
1143
490
1437
490
1436
490
1729
Stick the seal provided
edge of the hob.
loosen
b
Appliance
c
Tensioning screw
d
Clamp
e
Worktop
f
Seal
Turn the tensioning screws
clamps on the appliance
anti-clockwise direction until a resist-
ance is met and turn the clamps to
the left.
Place the appliance into position,
turn the clamps and tighten the ten-
sioning screws until the clamps
press into the worktop
Connect the appliance to the elec-
tricity supply.
When building-in several Combiset
units, a spacer bar must be fitted be-
tween the units. It is supplied with its
own installation instructions.
f
under the
tighten
c
in the
b
in an
e
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Km 87-2

Table of Contents