Download Print this page

Porter-Cable DA250B Instruction Manual page 10

Finish nailer
Hide thumbs Also See for DA250B:

Advertisement

Fig. 25
Fig. 26
A rubber nose cushion
(A) Fig. 25, is provided to reduce marring of the work
surface. The rubber cushion
can be removed
to provide increased
depth-of-
drive for toe-nailing
applications.
When not in use, a storage
location
is
provided for the the rubber cushion
on the magazine (A) Fig. 26.
Disconnect
tool from air supply before removing or
re-installing
rubber cushion.
CLEARING
A JAMMED
FASTENER
_Disconnect
tool from air supply.
1.
Remove any remaining
fasteners from the nailer.
A. Place finger in recess
(A) Fig. 27, and push lever to release follower
mechanism.
B. Slide the follower
to the end of the magazine (refer back to Fig. 21).
C. Depress the lever (A) Fig. 28, to release follower
mechanism,
and slide
all remaining fasteners
out of the magazine.
NOTE: Make sure tip (B) Fig. 28 clears nail strip.
:ig. 28
2. Open the quick release latch and hinge the fastener guide plate open (B)
Fig. 29.
3. Remove the jammed fastener (see Fig. 30).
4. Close the fastener guide plate and secure with the quick release latch.
10

Advertisement

loading