Installationkits Contents; Suggested Tool Requirements; Preparation Of Chassis - LG HBLG7000H Owner's Manual

Table of Contents

Advertisement

InstallationKits Contents
Suggested Tool Requirements
NO.
NAME OF PARTS
Q_Y
i
FRAME CURTAIN
2
2
SILL SUPPORT
2
3
BOLT
2
4
NUT
2
5
SCREW(TYPE
A)
16
6
SCREW(TYPE
B)
3
7
SCREW(TYPE C)
5
8
FOAM-STRIP
1
9
DRAIN PIPE
1
10
FOAM-PE
1
11
FRAME GUIDE
2
12
WINDOW LOCKING B RACKET
1
13
FOAM-PE
1
I
SCREWDRIVER(+,
-), RULER,
KNIFE, HAMMER,
PENCIL,
LEVEL
PREPARATION OF CHASSIS
Remove
the screws which fasten the cabinet
at both sides and at the back
Slide the unit from the cabinet by gripping the
base pan handle and pulling forward while
bracing
the cabinet.
2_
,
4_
Cut the window sash seal to the proper
length.
Peel off the backing and attach the foam-pe
@to the underside
of the window sash,
Remove the backing from the top upper guide
Foam PE @ and attach it to the bottom
of the
upper guide,
5. Attach the upper guide onto the top of the
cabinet with 3 type A screws.
,
,
Insert the frame guides
@ into the bottom of
the cabinet.
Insert the Frame Curtain
(:_.) i nto the upper
guide and frame guides
@,
(Type A)
8. Fasten the curtains to the unit with 4 Type
A screws
(Type A)

Advertisement

Table of Contents
loading

Table of Contents