Window Requirements; Installation Kits Contents (Some Models Including Installation Kit) - LG LW1815HR Service Manual

Hide thumbs Also See for LW1815HR:
Table of Contents

Advertisement

Installation

Window Requirements

All supporting parts should be secured to firm wood, masonry, or metal.
NOTICE
• WINDOW REQUIREMENTS
1. This unit is designed for installation in standard double hung windows with actual opening widths from 29" to 41".
The top and bottom window sashes must open sufficiently to allow a clear vertical opening of 18" from the bot-
tom of the upper sash to the window stool.
2. The stool offset (height between the stool and sill) must be less than 1

Installation Kits Contents (some models including installation kit)

Left frame
curtain
Frame guide(2)
Window locking
bracket
Sill bracket (2)
Type A (14)
9 Room Air Conditioner
Top retainer bar
Foam-PE
(Adhesive-Backed)
Type B (7)
Type C (5)
Foam strip
(Plain-Back)
Support bracket(2)
Type D (2)
1
/
".
4
Foam-PE
(Adhesive-Backed)
Carriage Bolt (2)
Right frame
curtain
Lock Nut (4)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lw2415hr

Table of Contents