General Information - Goodman CPC SERIES Installation Instructions Manual

Light commercial self-contained packaged heating & cooling unit 3 ton - 6 ton cpc/cph series
Table of Contents

Advertisement

T
HIS UNIT MUST NOT BE USED AS A
DURING THE FINISHING PHASES OF CONSTRUCTION ON A NEW
. T
STRUCTURE
HIS TYPE OF USE MAY RESULT IN PREMATURE FAILURE
OF THE UNIT DUE TO EXTREMELY LOW RETURN AIR TEMPERATURES
AND EXPOSURE TO CORROSIVE OR VERY DIRTY ATMOSPHERES
HIGH VOLTAGE!
D
ISCONNECT ALL POWER BEFORE SERVICING OR
. M
INSTALLING THIS UNIT
ULTIPLE POWER SOURCES MAY
. F
BE PRESENT
AILURE TO DO SO MAY CAUSE PROPERTY
,
DAMAGE
PERSONAL INJURY OR DEATH
T
O PREVENT THE RISK OF PROPERTY DAMAGE, PERSONAL INJURY, OR DEATH,
DO NOT STORE COMBUSTIBLE MATERIALS OR USE GASOLINE OR OTHER
FLAMMABLE LIQUIDS OR VAPORS IN THE VICINITY OF THIS APPLIANCE.

GENERAL INFORMATION

T
O PREVENT PROPERTY DAMAGE PERSONAL INJURY OR DEATH
,
,
TO FIRE
EXPLOSIONS
SMOKE
SHOCK OR CARBON MONOXIDE
,
,
INSTALLED
REPAIRED
OPERATED
This unit is approved for outdoor installation ONLY.
Rated performance is achieved after 72 hours of opera-
tion. To assure that your unit operates safely and efficiently,
it must be installed, operated, and maintained in accor-
dance with these installation and operating instructions,
all local building codes and ordinances.
EPA R
EGULATIONS
I
: T
U
S
MPORTANT
HE
NITED
A
(EPA)
GENCY
HAS ISSUED VARIOUS REGULATIONS REGARDING
THE INTRODUCTION AND DISPOSAL OF REFRIGERANTS IN THIS
. F
UNIT
AILURE TO FOLLOW THESE REGULATIONS MAY HARM THE
ENVIRONMENT AND CAN LEAD TO THE IMPOSITION OF
. B
SUBSTANTIAL FINES
ECAUSE REGULATIONS MAY VARY DUE TO
,
PASSAGE OF NEW LAWS
WE SUGGEST A CERTIFIED TECHNICIAN
PERFORM ANY WORK DONE ON THIS UNIT
ANY QUESTIONS PLEASE CONTACT THE LOCAL OFFICE OF THE
EPA.
WARNING
"
CONSTRUCTION HEATER
WARNING
.
WARNING
WARNING
,
,
,
SOOT
CONDENSATION
ELECTRIC
,
THIS UNIT MUST BE PROPERLY
,
.
AND MAINTAINED
E
P
TATES
NVIRONMENTAL
ROTECTION
. S
HOULD YOU HAVE
N
C
ATIONAL
ODES
This product is designed and manufactured to permit instal-
lation in accordance with National Codes. It is the installer's
"
responsibility to install the product in accordance with Na-
tional Codes and/or prevailing local codes and regulations.
.
The heating and cooling capacities of the unit should be
greater than or equal to the design heating and cooling loads
of the area to be conditioned. The loads should be calculated
by an approved method or in accordance with ASHRAE Guide
or Manual J - Load Calculations published by the Air Condi-
tioning Contractors of America.
American National Standards Institute
System design and installation should also, where applicable,
follow information presented in accepted industry guides such
as the ASHRAE Handbooks. The manufacturer assumes no
responsibility for equipment installed in violation of any code
or regulation. The mechanical installation of the packaged
roof top units consists of making final connections between
the unit and building services; supply and return duct con-
nections; and drain connections (if required). The internal
systems of the unit are completely factory-installed and tested
prior to shipment.
Units are generally installed on a steel roof mounting curb
assembly which has been shipped to the job site for installa-
tion on the roof structure prior to the arrival of the unit. The
model number shown on the unit's identification plate identi-
fies the various components of the unit such as refrigeration
,
DUE
tonnage, heating input and voltage.
Carefully inspect the unit for damage including damage to
the cabinetry. Any bolts or screws which may have loosened
in transit must be re-tightened. In the event of damage, the
receiver should:
1. Make notation on delivery receipt of any visible
damage to shipment or container.
2. Notify carrier promptly and request an inspection.
3. In case of concealed damage, carrier should be
notified as soon as possible-preferably within 5 days.
4. File the claim with the following supporting documents:
a. Original Bill of Lading, certified copy, or indemnity
bond.
b. Original paid freight bill or indemnity in lieu thereof.
c. Original invoice or certified copy thereof, showing
trade and other discounts or reductions.
d. Copy of the inspection report issued by carrier
representative at the time damage is reported to the
carrier. The carrier is responsible for making prompt
inspection of damage and for a thorough
investigation of each claim. The distributor or
manufacturer will not accept claims from dealers for
transportation damage.
3
Obtain from:
1430 Broadway
New York, NY 10018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents