Operation; Maintenance - Craftsman HYDROGLASS 390.2511 Owner's Manual

Convertible deep well jet pump
Hide thumbs Also See for HYDROGLASS 390.2511:
Table of Contents

Advertisement

OPERATION
MAINTENANCE
PRIMING
THE SHALLOW
WELL
PUMP
TO PREVENT
DAMAGE TO INTERNAL
PARTS,
DO NOT
START
MOTOR
UNTIL PUMP
HAS BEEN FILLED WITH
WATER.
1. Be sure pressure
regulator
located
on pump
body is open
at all times
during
priming
and running.
Turn
counter-
clockwise
all the way.
2. Remove
priming
plug.
Fill pump
with
water.
Replace
priming
plug.
ff a priming
tee and plug have been
pro-
vided for a long horizontal
run, be sure this line is filled
and the plug
replaced,
using
pipe
compound
on plug
threads.
See Figure 7, Page 7.
3. Start the pump
and run for approximately
thirty (30) sec-
onds.
Stop
pump,
remove
prime
plug
and
refill with
water.
Replace
prime
plug and gauge
and restart
pump.
Water
v/ill be pumped
in a few minutes,
the time
de-
pending
on the depth
to water
and length
of horizontal
run. ffpump
does not prime,
check
for a possible
leak on
the suction
side of pump.
Check
to be sure suction
lift -
distance
from
water
level
to pump
- does
not exceed
twenty
(20) feet.
PRIMING
THE
DEEP
WELL
PUMP
TO PREVENT
DAMAGE
TO INTERNAL
PARTS, DO NOT
START
MOTOR
UNTIL
PUMP
HAS BEEN FILLED WITH
WATER.
1. Remove
the priming
plug. Open
pressure
regulator
(turn
counter-clockwise)
located
on the pump
body. Fiil pump
and piping
with water
and replace
plug and tighten
only
until it seals.
NOTICE:
For location
of pressure
regulator,
see Installation
Diagrams
on Pages 4 and 5.
2. Close the pressure
regulator
(turn clockwise).
3. Open
several faucets in the house or near the tank to pre-
vent pressure
build up in tank.
4. Start pump.
Pressure
should
build up rapidly as the jet and
pump
prime.
Pressure
will be in excess
of 60 pounds.
If
this fails to happen,
repeat
2 and 3 above.
5. Once
unit has primed
on pressure
lxas stabilized,
slowly
open
(turn counter-clockwise)
the pressure
regulator
and
water will begin to be pumped
into tank.
6. Continue
to open pressure
regulator
until pressure
falters
(becomes
erratic).
At this point,
close
(turn
clockwise)
the pressure
regulator
slightly
until pressure
stabilizes.
Close faucets
and allow pump
to pressurize
the tank and
shut off.
7. To insure
pump is operating
properly,
alternately
open
and close
faucets in system.
With faucets
open,
pressure
will drop
until pressure
switch
starts
pump;
and with
faucets
closed,
pressure
will
build
up until
pressure
switch
shuts off pump.
8. There
are certain
conditions
of deep
well
operation
whereby
the pressure
regulator
can be completely
open
without
any faltering
of pressure
and if so, pump
should
be operated
in this manner.
LUBRICATION
It is not necessary
to lubricate
the pump or its motor.
The
motor
has two ball bearings
lubricated
for life. The
me-
chanical
shaft seal in the pump
is water
lubricated
and self-
adjusting.
DRAINING
FOR WINTER
When
the pump
is to be disconnected
from service,
or is in
danger
of freezing,
it should
be drained.
The
pump
has a
drain
cock
which
must
be opened.
Remove
the priming
plug to vent the pump.
Dram the pressure
tank. Drain all pip-
ing to a point
below
the freeze
line.
To drain an air volume
control,
remove
AVC tubing
and turn
(loosen)
it 180 ° on the 1/4" pipe fitting in the tank. This will
permit
any water
remaining
in the air volume
control
to
drain back into the tank.
DISASSEMBLY
AND ASSEMBLY
OF PUMP
The SEARS Hydroglass
* pump
is designed
for ease in servic-
ing and maintenance.
1. Disassemble
pump
as follows:
A. Disconnect
power.
B. Drain
pump
by opening
drain
cock
on bottom
of
pump
body and remove
pressure
switch
tubing
from
fitting
on top of pump
body. This will allow air to re-
place the water
in the pump.
C. Remove
clamp,
Key No. 11, Page 16, which
holds the
two pump
halves
together.
D. Remove pump base mounting
bolts. Motor assembly and
back half of pump can now be pulled away from pump
front half. Carefully
remove O-Ring and place in a clean
area. Inside of pump
is now accessible
for service.
2. Reassembly
of pump.
A. With a clean cloth,
wipe
out all foreign
material
from
the large O-Ring groove
on the pump
back half. Also
wipe
clean the large O-Ring and also the small O-Ring,
Key No. 6, Page 16 on the diffuser,
Key No. 10, Page
16. This vdll insure
a good tight seal.
B. Lubricate
O-Rings with
petroleum
jelly for ease of as-
sembly.
Place large O-Ring in groove.
C. Pump
halves
can now be slid together
until they are
parallel
and are as close together
as possible.
D. BE SURE inside
of clamp
is clean.
Place
clamp
on
pump
halves
and snug up. Alternately
tighten
clamp
screw and tap around
outside
of clamp
with a plastic
mallet.
This vdU insure
proper
seating
of O-Ring and
clamp.
E. Assemble
base
mounting
bolts.
Reconnect
pressure
switch
tubing
and tighten
drain cock.
F. Reprime
pump
and turn on power.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents