Dishwasher Installation; Locate Installation Items; Install Trim Pieces; Check Door Balance - GE CDWT9 - Cafe 24 in. Dishwasher Installation Instructions Manual

Built-in dishwasher
Table of Contents

Advertisement

Available languages

Available languages

Dishwasher Installation
Tgpe 1 - One-hole
cable
CAUTION
Adjust tension by moving spring hook to one of the three holes
Do not remove the wood base until you are ready to
on the tub leg.
install the dishwasher. The dishwasher will tip over
INCREASE
when the door is opened if the base is removed.
I
o
re'tire
la base de madera hasta que est(_ listo para
D
AS
instalar la lavadora de platos. Cuando la puerta se abra,
la lavadora de platos se inclinar6 si la base se retira.
STEP 1 - LOCATE INSTALLATION
ITEMS
• Locate the items in the installation package and set aside for
use in the listed steps.
• Trim pieces - Step 2
• Junction box cover - Step 7 or Step 19
• Drain hose and clamp - Step 10
• Countertop Bracket Kit - Step 12
• Screw Kit - Step 16
• Drain hose hanger - Step 18
• Owner's Manual- Step 20 and Step 25
• Hard Water test strip - Step 22
• Sound upgrade kit (selected models) - Step 2:3
• Product samples and/or coupons - Step 25
Figure H
Tgpe 2 - Three-hole
cable
Adjust tension by moving spring hook to one of the three holes
on the pulley cable.
STEP 2 -INSTALL
TRIM PIECES
In this step, you will need the trim pieces set aside in Step 1.
• Press top trim piece onto top of tub flange. Start with the
right edge and work your way to the left.
• Repeat process with the left and right trim pieces working
from the top down.
• Open and close the door to check that trim does not bind
and does not interfere with door latch or door hinges.
I rlrT1 bLrlp
Decrease
Trim
Strip
Figure G
STEP 3 - CHECK DOOR BALANCE
• With dishwasher on the wood skid, check the door balance
by opening and closing the door.
• If the door drops when released, increase the spring tension.
If the door rises when released, decrease the tension.
• There are two types of counterbalances and therefore two
methods of adjustment. Identify which counterbalance is
present and adjust tension accordingly. Please note: If there
are :3holes on the cable, use the cable to adjust; if there is
one hole on cable, use the tub leg to adjust.
Figure I
Increase
Tension
After adjusting spring tension, open and close the door to
make sure the door operates smoothly. If the door is hard
to move or if the spring cable binds, check the routing of
the spring cable. The cable should be routed between the
shoulders of the pulley cable roller. If the cable is off the roller:
latch door, remove spring tension and route the cable between
the shoulders of the roller. See Figure J.
Pulle__
Shoulder
Figure J
Correct Spring
Cqble Routing
Incorrect Spring
CQbleRouting
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cdwt9 24

Table of Contents