Air Flow Balancing - Maytag ERV-150 Installer Manual

Ventilation systems
Table of Contents

Advertisement

10.0 Air Flow Balancing

W
N
HAT YOU
EED TO
A magnehelic gauge capable of measuring 0 to
0.25 inch of water (0 to 62.5 Pa) and 2 plastic
tubes.
Two "Flow Measuring Stations" or two flow
collars (the size will vary depending on the duct
diameter).
P
S
RELIMINARY
TAGES TO
Seal all the unit ductwork with tape. Close all windows and doors.
Turn off all exhaust devices such as range hood, dryer and bathroom fans.
Make sure all filters are clean (if it is not the first time you balance the unit).
Make sure the balancing dampers are fully open (F and G in figure 20).
Choose appropriate locations for the 2 flow collars (or flow measuring stations), according to figure 20:
On the exhaust air duct (first measuring location, A)
On the fresh air distribution duct (second measuring location, B
At least 36" away from the unit; at least 12" before or after a 90° elbow; at least 12" away from a
register.
OR
B
12¨(30 mm)
04m
12¨(304mm)
VP0012A
Figure 20
I
F
NSTALLATION OF
LOW
If you are using Flow Collars:
Insert the flow collars in the duct at each location. Make sure their arrows are pointing in the direction
of the airflow. Tape collars in place temporarily.
If you are using "Flow Measuring Stations":
Cut a 1" (25.4mm) diameter hole in the duct at each location. Insert the "Flow Measuring Stations".
Make sure their arrows are pointing in the direction of the airflow. Tape the "Flow Measuring Stations"
in place temporarily.
B
U
ALANCE THE
NIT
B
U
ALANCE THE
36¨(914mm)
F
C
"F
OLLARS OR
LOW
VP0005
Flow collar
NIT
M
S
EASURING
TATIONS
26
VP0006
Flow measuring station
A
36¨(914mm)
G
"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Erv-210Hrv-150Hrv-210

Table of Contents