Check Inlet Gas Supply - Lochinvar Knight WH 55 Installation & Operation Manual

Wall mount boiler
Hide thumbs Also See for Knight WH 55:
Table of Contents

Advertisement

7
Gas connections
Table 7A Natural Gas Pipe Size Chart
Nominal
Iron Pipe
Size (Inches)
10
20
1/2
175
120
3/4
369
256
1
697
477
1-1/4
1400
974
1-1/2
2150
1500
2
4100
2820
2-1/2
6460
4460
3
11200
7900
4
23500 16100 13100 11100 10000
Knight wall mount boilers are typically shipped ready to fire on natural gas. Check boiler rating plate to
WARNING
determine which fuel the boiler is set for. If set to natural gas, it may be converted to LP by installing an
orifice (see page 13). In order to operate on LP gas, an orifice MUST BE installed. Failure to comply could
result in severe personal injury, death, or substantial property damage.

Check inlet gas supply

CSA or UL listed flexible gas connections
NOTICE
are acceptable, but you must exercise
caution to ensure that the line has
adequate capacity to allow your boiler
to fire at full rate. Consult with local
codes for proper installation or service
procedures.
DO NOT adjust gas valve outlet
WARNING
pressure. The gas valve is factory-set
for the correct outlet pressure.
setting is suitable for natural gas and
propane, requiring no field adjustment.
Attempting to alter the gas valve outlet
pressure could result in damage to the
valve, causing potential severe personal
injury, death, or substantial property
damage.
The gas piping must be sized for the proper flow and length
of pipe, to avoid excessive pressure drop. Both the gas
meter and the gas regulator must be properly sized for the
total gas load.
If you experience a pressure drop greater than 1 inch w.c.,
the meter, regulator, or gas line is undersized or in need of
service. Perform the steps below when checking inlet gas
supply:
1.
Shut off power at source.
2.
Shut off gas supply at the manual gas valve in the gas
piping to the appliance.
50
Natural Gas Pipe Capacity Chart
Length of Pipe in Straight Feet for 1/2 PSI
30
40
50
60
97
82
N/A
N/A
205
174
155
141
384
328
292
267
789
677
595
543
1210
1020
923
830
2260
1950
1720
1560
3610
3100
2720
2460
6400
5400
4870
4410
9000
This
Installation & Operation Manual
70
80
90
100
N/A
N/A
N/A
N/A
128
121
113
106
246
236
210
200
502
472
441
410
769
707
666
636
1440
1330
1250
1180
2310
2100
2000
1900
4000
3800
3540
3330
8300
7690
7380
6870
3.
Loosen the set screw one (1) full turn from inside the
pressure tap on top of the gas valve. Place the tubing of
the manometer over the tap once the set screw is
loosened as shown in FIG. 7-3.
4.
Slowly turn on the gas supply at the field installed
manual gas valve.
5.
Turn on power at source..
6.
Adjust the temperature set point on the control panel of
the SMART SYSTEM control module to call for heat.
7.
Observe the gas supply pressure as the burner fires at
100% of rated input. Percent of burner input will be
displayed on the control panel.
8.
Ensure inlet pressure is within specified range.
Minimum and maximum gas supply pressures are
specified in this section of the manual.
9.
If gas supply pressure is within normal range and no
adjustments are needed, proceed on to Step 11.
10. If the gas pressure is out of range, contact the gas utility,
gas supplier, qualified installer or service agency to
determine the necessary steps to provide proper gas
pressure to the control.
11. Shut off power at source.
12. Shut off the gas supply at the manual gas valve in the gas
piping to the appliance.
13. Remove the manometer from the pressure tap on top of
the gas valve. Re-tighten the set screw inside the pressure
tap.
125
150
175
200
N/A
N/A
N/A
N/A
95
86
79
74
179
164
149
138
369
333
308
287
564
513
472
441
1100
974
871
820
1700
1540
1400 1300
3000
2720
2500 2340
6150
5640
5130 4720

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents