Sign In
Upload
Manuals
Brands
Lochinvar Manuals
Boiler
Knight 399
Lochinvar Knight 399 Manuals
Manuals and User Guides for Lochinvar Knight 399. We have
3
Lochinvar Knight 399 manuals available for free PDF download: Installation & Operation Manual, Installation And Service Manual
Lochinvar Knight 399 Installation & Operation Manual (76 pages)
Commercial Boiler
Brand:
Lochinvar
| Category:
Boiler
| Size: 7.99 MB
Table of Contents
Hazard Definitions
2
Table of Contents
2
Please Read before Proceeding
3
The Knight XL - How It Works
4
Model 399
5
The Knight Xl -- How It Works
6
Ratings
7
1 Determine Boiler Location
8
Provide Air Openings to Room
10
Flooring and Foundation
10
Residential Garage Installation
10
Vent and Air Piping
10
Prevent Combustion Air Contamination
10
Corrosive Contaminants and Sources
11
Using an Existing Vent System to Install a New Boiler
11
Removing a Boiler from Existing Common Vent
12
2 Prepare Boiler
13
Remove Boiler from Wood Pallet
13
Gas Conversions
13
Model 399
13
Model 500
14
Models 600 - 800
14
Leveling the Boiler
14
Direct Venting Options
15
3 General Venting
16
Direct Venting Options
16
Install Vent and Combustion Air Piping
17
PVC/CPVC Vent Piping Materials
17
Requirements for Installation in Canada
17
Installing Vent or Air Piping
17
PVC/CPVC Air Intake/Vent Connections
18
Air Inlet Pipe Materials
19
Stainless Steel Air Intake/Vent Connections
20
Min./Max. Combustion Air & Vent Piping Lengths
21
Vent and Air Piping
21
Optional Room Air
21
Optional Room Air
22
4 SIDEWALL DIRECT VENTING Vent/Air Termination - Sidewall
23
Determine Location
23
Prepare Wall Penetrations
25
Termination and Fittings
26
Multiple Vent/Air Terminations
26
Sidewall Termination - Optional Concentric Vent
27
Sidewall Termination - Optional Concentric Vent
29
5 VERTICAL DIRECT VENTING Vent/Air Termination - Vertical
30
Determine Location
30
Prepare Roof Penetrations
31
Termination and Fittings
31
Multiple Vent/Air Terminations
31
Vertical Termination - Optional Concentric Vent
32
6 Hydronic Piping
34
System Water Piping Methods
34
Low Water Cutoff Device
34
Chilled Water System
34
Freeze Protection
34
General Piping Information
34
Flow Switch and Relief Valve Installation
35
Flow Switch Adjustment
36
Circulator Sizing
36
Near Boiler Piping Connections
36
Near Boiler Piping Components
38
7 Gas Connections
41
Connecting Gas Supply Piping
41
Natural Gas
42
Pipe Sizing for Natural Gas
42
Natural Gas Supply Pressure Requirements
42
Propane Gas
42
Pipe Sizing for Propane Gas
42
Propane Supply Pressure Requirements
42
Check Inlet Gas Supply
43
Gas Pressure
44
Gas Valve Replacement
44
8 Field Wiring
45
Line Voltage Connections
45
Low Voltage Connections
46
Wiring of the Cascade
47
9 CONDENSATE DISPOSAL Condensate Drain
49
10 Startup
50
For Your Safety Read before Operating
53
Operating Instructions
53
To Turn off Gas to Appliance
53
Startup
55
11 OPERATING INFORMATION General
56
Cascade
58
Cascade
59
Sequence of Operation
60
Knight XL Control Module
61
Status Display Screens
63
Status Display Screens
66
12 MAINTENANCE Maintenance and Annual Startup
67
Inspect Boiler Area
68
Check Expansion Tank
69
Check Boiler Relief Valve
69
Check Burner Flame
70
Check Control Settings
70
Check Flame Signal
71
Review with Owner
71
Cleaning Boiler Heat Exchanger
71
13 Diagrams
72
Wiring Diagram
72
Ladder Diagram
73
Revision Notes
76
Advertisement
Lochinvar Knight 399 Installation And Service Manual (72 pages)
HYDRONIC HEATING BOILERS and DOMESTIC WATER HEATERS 399,999 - 2,070,000 Btu/hr MODELS
Brand:
Lochinvar
| Category:
Boiler
| Size: 3.23 MB
Table of Contents
Domestic Water Heaters
1
Table of Contents
2
General Product Information
3
Special Instructions
3
Unpacking
3
Codes
3
Warranty
3
Safety Information
4
Product Identification
5
Installation
6
Locating Unit
6
Clearances from Combustible Construction
6
Base for Combustible Floors
7
Freeze Protection
7
Pump Operation
7
Location
7
Hydronic System Antifreeze
7
Outdoor Boiler Installation
7
Shutdown and Draining
8
Freeze Protection for a Heating Boiler System
8
Combustion and Ventilation Air
8
Combustion Air Filter
8
Combustion Air Options
9
Exhaust Fans
11
Venting
11
General Information
11
Venting Support
11
Vertical Vent Termination Clearances and Location
11
Sidewall Vent Termination Clearances and Location
12
Combustion Air Inlet Piping
13
Combined Air Inlet Points
15
Vent System Options
15
Barometric Damper Location
15
Conventional Negative Draft Venting
16
2. Vertical Directaire™ Venting
17
Sidewall Venting
19
Horizontal Directaire ™ Venting
21
Direct Venting
22
Outdoor Installation Venting
26
Connecting to Gas Supply
28
Gas Pressure Test
28
Gas Piping
28
Connecting Gas Piping to Unit
28
Gas Train and Controls
29
Combination Gas Valves
30
Venting of Combination Gas Valves
30
Checking Gas Supply Pressure
30
Gas Manifold Pressure Adjustment
31
Connecting to Water Supply
32
Inlet and Outlet Connections
32
Relief Valve
33
Water Flow Switch
33
Low Water Cutoff
33
Connecting to Electrical Supply
33
Boiler System Piping
34
Primary/Secondary Boiler Piping
35
Low Temperature Return Water Systems
36
Radiant Floor and Snow Melt Heating Systems
37
Boiler Flow Rate
38
Boiler Bypass Requirements
38
Temperature/Pressure Gauge
38
Placing the Boiler in Operation
38
Installation with a Chilled Water System
39
Boiler Operating Temperature Control
39
Water Treatment
40
Terminal Strip Connection Options
40
Operation
41
Lighting Instructions
42
To Turn off Gas to Appliance
43
Programming Temperature Control
43
Quick Programming Overview
43
Adjust Menu Setting Descriptions
44
Access Levels
46
Temperature Control
46
Placement of Sensors
46
Staging Logic
47
Hot Surface Ignition System
49
Operation and Diagnostic Lights
51
Domestic Water Heaters
52
Water Velocity Control
52
Water Chemistry
52
Pipe Size Requirements
53
Circulating Pump
53
Minimum Pump Performance
54
Heat Exchanger
54
Potable Hot Water Temperature Control Settings
54
Location of Cold Water Supply Piping Connections
55
High Water Temperature Limit Control
55
Optional Relief Valve
55
Thermal Expansion
55
Cathodic Protection
55
Cleaning and Maintenance
56
Combustion and Ventilation Air
57
Adjusting Differential Air Pressure
58
Servicing Hot Surface Igniter and Ignition Module
59
Ignition System Checkout
59
Sequence of Operation
59
Troubleshooting Guide
62
750,000 Btu/Hr Models
62
Troubleshooting Guide
63
2,070,000 Btu/Hr Models
63
Wiring Diagram
64
Lochinvar Knight 399 Installation & Operation Manual (80 pages)
Wall Mount Boiler
Brand:
Lochinvar
| Category:
Boiler
| Size: 8.63 MB
Table of Contents
Hazard Definitions
2
Table of Contents
2
Please Read before Proceeding
3
The Knight Wall Mount Boiler - How It Works
4
Ratings
6
1 Determine Boiler Location
7
Provide Clearances
7
Provide Air Openings to Room
9
Wall Mounting Location
9
Residential Garage Installation
9
Vent and Air Piping
9
Prevent Combustion Air Contamination
9
Corrosive Contaminants and Sources
10
Using an Existing Vent System to Install a New Boiler
10
Removing a Boiler from Existing Common Vent
11
2 Prepare Boiler
12
Remove Boiler from Wood Pallet
12
Gas Conversions
12
Mounting the Boiler
13
3 General Venting
14
Install Vent and Combustion Air Piping
15
Requirements for Installation in Canada
16
Sizing
16
Materials
17
Optional Room Air
18
Pvc/Cpvc
19
Polypropylene
20
Stainless Steel Vent
21
4 SIDEWALL DIRECT VENTING Vent/Air Termination - Sidewall
22
Determine Location
22
Prepare Wall Penetrations
24
Multiple Vent/Air Terminations
25
Sidewall Termination - Optional Concentric Vent
26
Sidewall Termination - Optional Concentric Vent
28
5 VERTICAL DIRECT VENTING Vent/Air Termination - Vertical
29
Determine Location
29
Prepare Roof Penetrations
29
Multiple Vent/Air Terminations
30
Vertical Termination - Optional Concentric Vent
30
Alternate Vertical Concentric Venting
32
6 Hydronic Piping
33
System Water Piping Methods
33
Low Water Cutoff Device
33
Chilled Water System
33
Freeze Protection
33
General Piping Information
33
Near Boiler Piping Components
34
Near Boiler Piping Connections
35
Circulator Sizing
35
Variable Speed Pump Option
37
7 GAS CONNECTIONS Connecting Gas Supply Piping
48
Natural Gas
49
Pipe Sizing for Natural Gas
49
Natural Gas Supply Pressure Requirements
49
Propane Gas
49
Pipe Sizing for Propane Gas
49
Propane Supply Pressure Requirements
49
Check Inlet Gas Supply
50
Gas Pressure
51
Gas Valve Replacement
51
8 Field Wiring
52
Line Voltage Connections
52
Low Voltage Connections
52
Outdoor Temperature Sensor
53
Flow Switch
53
Wiring of the Cascade
54
9 CONDENSATE DISPOSAL Condensate Drain
56
10 Startup
57
Check for Gas Leaks
58
Start the Boiler
59
Set Space Heating Operation
62
Startup
63
11 Operating Information
64
General
64
Cascade
67
Sequence of Operation
68
Access Modes
69
Knight Wall Mount Boiler Control Module
70
Status Display Screens
71
12 MAINTENANCE Maintenance and Annual Startup
74
Address Reported Problems
75
Inspect Boiler Area
75
Check Expansion Tank
76
Check Boiler Relief Valve
76
Review with Owner
77
Check Burner Flame
77
Cleaning Boiler Heat Exchanger
77
Check Flame Signal
77
Oiled Bearing Circulators
77
13 Diagrams
78
Ladder Diagram
78
Wiring Diagram
79
Advertisement
Advertisement
Related Products
Lochinvar KNIGHT 399 - 800
Lochinvar 399,999 Btu/hr
Lochinvar Knight 399 - 500
Lochinvar KNIGHT 51-211
Lochinvar Knight XL 400
Lochinvar Knight XL 801
Lochinvar KNIGHT 210
Lochinvar KNIGHT 50
Lochinvar KNIGHT 400 - 801
Lochinvar Knight 50-210
Lochinvar Categories
Water Heater
Boiler
Gas Heater
Swimming Pool Heater
Heat Pump
More Lochinvar Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL