Scope of Delivery The scope of delivery depends on your order. Before proceeding to the installation, check whether all the necessary parts are available. Equipment (as per subclass): – 1 Machine head – 2 Sewing light – 3 Table top –...
Setting the Working Level – The working level can be set between 750 and 900 mm (Measured up to the table top). – Loosen the screws 1 on the sleepers of the stand. – Set the table top so that it is at the desired level and in horizontal position.
Electrical Connection ATTENTION ! Any work on the electrical equipment of the sewing unit should be carried out exclusively by the properly qualified electricians or by properly qualified staff!. The mains plug must be pulled out. It is absolutely necessary to respect the enclosed manufacturer’s instructions for the step motor.
Pneumatic Connection ATTENTION ! A perfect function of the pneumatic elements will only be ensured if the line pressure ranges between 8 and 10 bar. The service pressure of the special sewing machine amounts to 6 bar. Pneumatic connection kit Under the reference number 0797 003031 it is possible to obtain a pneumatic connection kit for stands with conditioning unit for compressed air.
Page 7
Lubrication Caution Risk of Injury! Oil can cause skin rashes. Avoid longer skin contact. After contact wash yourself thoroughly. ATTENTION ! The handling and disposal of mineral oils is subject to legal regulations Deliver used oil to an authorized reception point. Protect your environment.
Sewing Test After the installation work, carry out a sewing test. – Insert the mains plug. Caution Risk of Injury! Switch off the main switch. Switch off the sewing machine before threading the needle and the hook thread. – Thread the reel thread (See Operating Instructions). –...
Need help?
Do you have a question about the 550-16-23 and is the answer not in the manual?
Questions and answers