1. Scope of Delivery Basic equipment consists of: – Complete sewing machine for advance crimping – Frame MG53-3 with pallet table top 1530 x 951 mm – Multi-program controls 200-3 – Direct current positioning drive – Compressed Air Maintenance Unit –...
2.2 Mounting the Thread Stand Mount the thread stand on the table top as shown in the sketch above. 2.3 Checking the V-belt Tension After transport the V-belt tension set at the factory is to be checked. The V-belt 1 must be so tensioned that it can be pressed in at the center by about 10 mm under finger pressure.
2.4 Filling Oil For filling the oil reservoir use only ESSO SP-NK 10 lubrication oil. SP-NK 10 is available from the DÜRKOPP ADLER AG sales offices. – Fill the hook drive housing and the reservoir for the central oil wick lubrication up to the top line marking with oil (see chapter 3.2 of the Operating Instructions).
3. Electrical Connection ATTENTION ! All work on the electrical components of the sewing unit may only be conducted by electricians or appropriately trained personnel. The mains plug must be pulled out. 3.1 Checking the Nominal Voltage The nominal voltage listed on the motor rating plate of the sewing drive and the mains voltage must be the same ! 3.2 Checking Positioning The machine should position when the thread pulling lever is at its...
Need help?
Do you have a question about the 550-12-12 and is the answer not in the manual?
Questions and answers