Delivery; Introduction; Installation Of Sewing Machine; Removing Of Transport Packaging - Duerkopp Adler 739 Installation Instructions & Replacement Parts List

Table of Contents

Advertisement

1. Delivery

2. Introduction

3. Installation of sewing machine

3.1 Removing of transport packaging

The scope of delivery depends on your order.
Prior to installation, please check whether all required parts have been
supplied.
Equipment:
1 yarn stand
2 sewing machine head
3 operating panel
4 sewing lamp (optional)
5 material clamp support
6 material clamp (optional)
7 waste bin with suction control
8 drawer
Separately packed small
components
CAUTION!
The sewing machine must be installed by suitably trained specialised
personnel.
Work at electrical components must be carried out by electricians or
other suitably trained staff.
Prior to such work, always discconect unit from the power supply.
Always comply with the instructions given by the manufacturer of the
step motors in the enclosed operating manual.
Remove transport packaging and securing devices at the sewing
machine head.
2-3

Advertisement

Table of Contents
loading

Table of Contents