Page 1
Contents Page: Home Part 2: Installation Instructions for the 743-121 Delivery Scope for the Sewing Unit ....... . Installing the Sewing Unit Transporting the Sewing Unit .
1. Delivery Scope for the Sewing Unit – Basic equipment, depending on execution with bundle clamp and remover device. – Microcontrol. – Thread stand. – Small parts with the accessories. 2. Installing the Sewing Unit CAUTION ! The sewing unit may only be installed by trained personnel. Before installation the following transport securing devices are to be removed: –...
2.2 Setting the Work Height The work height is adjustable between 84.5 cm and 124.5 cm. The sewing unit is set at its lowest height for shipping. Setting the work height – Loosen the fastening screws 1 - 4. – Set the unit horizontally to the desired height.
3. Elektrical Connection CAUTION ! All work on the sewing unit’s electrical components must only be conducted by electricians or appropriately trained persons. The mains plug must be dis-connected. 3.1 Connecting the Microcontrol – Place the control unit on the mounting plate (snap-on mounting).
3.3 Setting the Motor Protection Switch The motor protection switch must be set appropriately to the mains voltage. 220 - 230 V 4,2 A 380 - 400 V 2,5 A 3.4 Checking the Direction of Motor Rotation CAUTION ! Before commissioning the sewing unit it is essential that the direction of the motor rotation be checked.
4. Pneumatic Connection CAUTION ! For a flawless functioning of the pneumatic control procedures the following points must be observed. The compressed air supply is to be such that the minimum operating pressure does not fall below 5 bar , even at the moment of greatest air consumption.
Need help?
Do you have a question about the 743-121 and is the answer not in the manual?
Questions and answers