Download Print this page

Delivery Scope For The Sewing Unit; Installing The Sewing Unit; Transporting The Sewing Unit - Duerkopp Adler 743-121 Installation Instructions Manual

Hide thumbs Also See for 743-121:

Advertisement

1. Delivery Scope for the Sewing Unit

2. Installing the Sewing Unit

2.1 Transporting the Sewing Unit

Basic equipment, depending on execution with bundle clamp and
remover device.
Microcontrol.
Thread stand.
Small parts with the accessories.
CAUTION !
The sewing unit may only be installed by trained personnel.
Before installation the following transport securing devices are to be
removed:
The securing band from the sewing drive.
The angles which hold the frame feet to the wooden pallet.
The screw clamps on the transport carriage.
The sewing unit has 4 castors for moving it in-house.
CAUTION !
When the sewing unit is in operation the castors must be screwed in so
far that the unit stands firmly on its feet.
For transport turn the set screws 1 - 4 to the left.
The feet must have sufficient floor clearance for transport.
Move the sewing unit.
To lower the sewing unit turn the set screws 1 - 4 to the right.
The feet must stand firmly on the floor.
1
2
3
4
3

Advertisement

loading