Yamaha YZFR6Z(C Owner's Manual page 63

Table of Contents

Advertisement

1. Plastic fastener
2. Projection
3. Wire harness
3. Remove the bolts and the quick
fastener, and then pull the cowling
off as shown.
1. Cowling C
2. Bolt
3. Quick fastener
PERIODIC MAINTENANCE AND ADJUSTMENT
To install the cowling
1. Fit the slot in cowling C over the
projection on the front cowling.
1. Cowling C
2. Slot
3. Front cowling
4. Projection
2. Install the bolts and the quick fas-
tener.
3. Place the wire harness in the orig-
inal position, and then close the
plastic fastener.
4. Install the cowling and the panel.
Panels A and B
To remove one of the panels
Remove the bolts, and then pull the
panel off as shown.
7-12
1. Panel B
2. Bolt
To install the panel
Place the panel in the original position,
and then install the bolts.
EAU39061
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yzfr6z

Table of Contents