230 Volt Electrical Installation - Cal Spas LTR20101001 Owner's Manual

All portable spas
Table of Contents

Advertisement

6

230 Volt Electrical Installation

All 230V spas must be permanently connected
(hardwired) to the power supply. These instructions
describe
the
procedure. Spas wired in any other way will void your
warranty and may result in serious injury.
This is the only acceptable electrical wiring procedure.
Spas wired in any other way will void your warranty.
See the wiring diagram on page 8.
The electrical wiring of this spa must meet the
requirements of any applicable local, state, and federal
codes. The electrical circuit must be installed by an
electrical contractor and approved by a local building /
electrical inspector.
RCD and Wiring Requirements
The power supplied to the spa must be on a dedicated
RCD protected circuit with no other appliances or
lights sharing the power.
Use copper wire with THHN insulation. Do not use
aluminum wire.
Use the table below to determine your GFCI and wiring
requirements.
Spa Model
All 230V spas except Ultimate
Fitness
Spas with the 6205 control
box
Fitness 2400 spa with one 5.5
kW heater
Fitness 2400 with 8.5 kW
heater (optional) and Fitness
2500 spa
Fitness 4700 spa
www.calspas.com
only
acceptable
electrical
One 32 amp RCD or two 16 amp
RCDs
One 32 amp RCD or two 16 amp
RCDs
One 32 amp RCD or two 16 amp
RCDs
Service 1: One 32 amp RCD or
two 16 amp RCDs
Service 2: One 32 amp RCD or
two 16 amp RCDs
Service 1 (swim side): One 32
amp RCD or two 16 amp RCDs
Service 2 (swim side): One 32
amp RCD or two 16 amp RCDs
Service 3 (spa side): One 32
amp RCD or two 16 amp RCDs
When wires larger than #6 AWG are required, install
a junction box near the spa and use #6 AWG wire
wiring
between the junction box and the spa.
Wire runs over 26 m must increase wire gauge to the
next lower number. For example: A normal 50 amp
RCD with four #8 AWG copper wires run over 26
m would require you to go to four #6 AWG copper
wires.
Testing the RCD Breaker
Test the RCD breaker prior to first use and periodically
when the spa is powered. To test the RCD breaker
follow these instructions (spa should be operating):
1.
Press the TEST button on the RCD. The RCD will
trip and the spa will shut off.
2.
Reset the RCD breaker by switching the breaker
to the full OFF position, wait a moment, then turn
the breaker back on. The spa should have power
again.
GFCI Required
Wires Required
Three #10 AWG copper wires
Four #10 AWG copper wires
Four #10 AWG copper wires
Service 1: Three #10 AWG copper wires
Service 2: Two #10 AWG copper wires
Service 1: Three #10 AWG copper wires
Service 2: Two #10 AWG copper wires
Service 3: Three #10 AWG copper wires
2010 Portable Spa
LTR20101001, Rev. B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2010 series

Table of Contents