Manual Method - Bunn DUAL GPR-DBC Programming Manual

With smart funnel
Table of Contents

Advertisement

PROGRAMMING FUNCTIONS - (cont.)
SET PULSE BREW - MANUAL METHOD
NOTE: The procedure to enter the PULSE BREW
function must be performed prior to following the
steps listed below.
1. The display should read 1st ON TIME X:XX and a
batch size indicator will be flashing.
2. Using (-) and (+) set the amount of time the flow
of water into the funnel will be on.
3. When finished, press DONE. The display will now
read OFF TIMES: X:XX.
4. Using (-) and (+) set the amount of time the flow
of water into the funnel will be off.
5. When finished, press DONE. The display will now
read LAST ON: X.XX
6. Using (-) and (+) set the amount of time the water
will be on to complete the brew.
7. When finished, press DONE. The display will show
the three times just entered for that batch size. After
a 5 second delay, the display will read 3 BATCHES
DONE?
8. If other batch sizes need to be modified, press NO.
9. Press a different batch size and repeat steps 3
through 7. Repeat until all the desired batch sizes
are set.
10. When finished press YES in 3 BATCHES DONE?.
The display will then read DRIP TIME.
11. Press and release the ON/OFF switch (either on
DUAL brewers) located on the front switch panel
to exit the SET PULSE BREW function and return
to the MAIN SCREEN.
NOTE: Pressing the upper right hidden switch before
reaching the final setting screen exits the setup and
retains the old values.
Page 25
SET PULSE BREW?
NO
YES
SELECT METHOD
EASY NEXT MANUAL
MANUAL SELECTED
1st
ON TIME:
X:XX
(-)
DONE
(+)
OFF TIMES:
X:XX
(-)
DONE
(+)
LAST ON:
X:XX
(-)
DONE
(+)
1st
OFF
LAST
X:XX
X:XX
X:XX
5 sec delay
3 BATCHES DONE?
NO
YES
DRIP TIME XX.X
(-)
DONE
(+)
41343 043012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Single gpr dbc-dv

Table of Contents