Pre-installation Survey
Site Inspection
Table 4-2
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
6.
Is the raised floor adequate for equipment
loading?
7.
Are there channels or cutouts for cable routing?
8.
Is there a remote console telephone line
available with an RJ11 jack?
9.
Is a telephone line available?
10.
Are customer supplied peripheral cables and
LAN cables available and of the proper type?
11.
Are floor tiles in good condition and properly
braced?
12.
Is floor tile underside shiny or painted? If
painted, judge the need for particulate test.
Power and lighting
No.
Area or condition
13.
Are lighting levels adequate for maintenance?
14.
Are there AC outlets available for servicing
needs? (i.e. vacuuming)
15.
Does the input voltage correspond to equipment
specifications?
15A
Is dual source power used? If so, identify type(s)
and evaluate grounding.
16
Does the input frequency correspond to
equipment specifications?
17.
Are lightning arrestors installed inside the
building?
18.
Is power conditioning equipment installed?
19.
Is there a dedicated branch circuit for
equipment?
20.
Is the dedicated branch circuit less than 250
feet (72.5 meters)?
21.
Are the input circuit breakers adequate for
equipment loads?
Safety
No.
Area or condition
38
Comment
or Date
Yes
No
Yes
No
Chapter 4