Setting Up The Hardware - Samsung CLX-9350ND Installation Manual

Installation guide
Hide thumbs Also See for CLX-9350ND:
Table of Contents

Advertisement

S etting up the hardware
1 .
We recommend you leave to setting up the hardware to the installation engineer from Samsung or
the dealership where you bought the machine.
This chapter gives you step-by-step instructions for setting up the hardware. We recommend you
set up the hardware following the order in this chapter.
This chapter includes:
Installation environment
Machine configuration
Optional goods by models
Installation flow of the hardware
Unpacking and placing the hardware
Installing the cabinet stand, optional dual cassette feeder or optional high capacity feeder
Installing the duplex automatic document feeder
Installing the accessory box
Removing the scanner locking screw
Putting the rubber packings
Installing the right tray (face up)
Installing the toner cartridges
Installing the imaging units
Installing other options
Loading paper
Connecting a printer cable
Turning the machine on
Be sure to go through the following before setting up the hardware:
If you are installing the machine after moving it from a cold to warm location, leave the machine unpacked for at
least two hours so that the machine is fully adapted to the site temperature, avoiding image faults caused by
condensation (The term "condensation" refers to the formation of droplets of water on the surface of a metal
object brought from cold to warm place, i.e., as the result of the rapid cooling of the moisture (vapor) around the
object).
Installation engineer must prepare the screw drivers and diagonal-cutting pliers.

Setting up the hardware_ 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clx-9350 seriesClx-9250 series

Table of Contents