Pump / Tank Hose Installation:

1.
Suction Hose, Tank to Pump. The Suction
hose connects to the front RH side of Tank (See
Figure 8) and runs through a Hose Ring that is
welded to the frame Rail (See Figure 9). The
Suction Hose connects to the front Pump on the Left
Hand Side of Pump (See Figure 10).
2.
Connect Pressure Hoses. There are two
pressure hoses that connect to the Pump. The
Larger Hose (See Figure 10 & 11) runs through a
weld on Hose Ring and to the Cutter Motor Control
Valve (See Figure 12). The Small Hose runs to the
Cyl. Control Valve. Connect the smaller hose to the
pump and route with the larger hose.
To Pump
Figure 9
Hose Ring
Pump Pressure
Hose to Cutter
Motor Control Valve
Figure 11
A-Boom (JD6615 / 7615 Asy Instruction Manual) 07/03
© 2003 Alamo Group Inc.
Hose Installation
From Tank
SUCTION HOSE
Hose Ring
Section 7 - 4
Tank Suction
Hose Side
Front of Tank &
Front of Tractor
Figure 8
Pump Pressure
Hose to Cutter
Motor Control Valve
Figure 10
Figure 12
Tank Return
Hose Side
Tank Suction
Hose from Hyd.
Tank
Pump Pressure
Hose Side to Cyl.
Control Valve
Pump Pressure
to Cutter / Motor
Valve