Cutter Motor Control Valve; Boom Installation / Boom Hoses - Alamo John Deere 6615 Assemble, Instruction Manual

John deere 6615 and 7615
Table of Contents

Advertisement

Cutter Motor Control Valve Asy:
1.
Cutter Motor Control Valve Asy. Install the
Cutter Motor Control Valve Asy to the LH side of
High Frame, it will not have the Hoses attached as
shown, the Hoses will be connected later (See
Figure 1)

Boom Installation / Boom Hoses:

1.
Hoses on Booms are shipped folded back
inside Boom.
Hoses must be pulled out and
moved to clear, then routed in the end of Boom
before installing Boom on the King Post (See
Figure 2)
2.
Pull the Lift Cylinder out to its full stroke, to
aid in the installation of the Lift arm (See Figure
3). When Pulling Cylinder Out, attach a Hose to
the Rod end and lay the Hose in a drain pan. This
will catch any Oil expelled when Cylinder is pulled
out.
3
.
With a hoist raise the Boom Arm (1) and
lower onto the King Post (2). Align the Boom Arm
and King Post with the Lift Hinge Point. Insert
Main Pin Bolt (3) into Boom Weldment and Turn-
ing Arm. Attach Lockwasher (4), Washer (5) and
Bolt (6) and tighten (also see Parts Section on the
Boom Assembly) (See Figure 3, 4 & 5)
Note: Additional support may
be need at the end of the Boom
to aid in installation.
3,4,5,6
A-Boom (JD6615 / 7615 Asy Instruction Manual) 07/03
© 2003 Alamo Group Inc.
Boom Installation
8,9,10
7
2
Figure 3
Section 7 - 2
Figure 1
Figure 2
Approximate Lift pont
Lifting Lugs weld on here
1
Hoses
Boom

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

John deere 7615A-boom

Table of Contents