Table Of Contents; Contents; Introduction - A.O. Smith VB-500, VB-750 Instruction Manual

Series 200/201 gas-fired copper boilers for hydronic heating and hot water supply
Hide thumbs Also See for VB-500, VB-750:
Table of Contents

Advertisement

SAFE INSTALLATION, USE AND SERVICE ...........................................2
GENERAL SAFETY......................................................................................3
DIMENSION AND CAPACITY DATA .........................................................4
CAPACITY AND FLOW DATA ....................................................................5
CONTENTS ...................................................................................................6
INTRODUCTION ...........................................................................................6
Grounding Instructions .............................................................................7
Inlet Water Considerations ......................................................................7
Correct Gas ..............................................................................................7
Precautions ...............................................................................................7
Liquefied Petroleum Gas Models ..........................................................7
High Altitude Installations ........................................................................7
Field Installed Components ....................................................................7
CONTROL COMPONENTS .........................................................................8
The Control System ................................................................................8
Hot Surface Igniter ..................................................................................8
Pressure Switches ...................................................................................8
Low Gas Switch ......................................................................................8
Water Flow Switch ..................................................................................8
Flame Sensor ...........................................................................................8
Water Temperature Limit Controls .........................................................9
ON/OFF Switch ........................................................................................9
Circulating Pump ......................................................................................9
Temperature Probes ................................................................................9
Low Water Cutoff (Optional) ..................................................................9
Pressure Relief Valve ..............................................................................9
GENERAL ....................................................................................................10
Required Ability ......................................................................................10
Location ...................................................................................................10
Panels and Covers ................................................................................10
Chemical Vapor Corrosion .................................................................... 11
Installtion Clearances ............................................................................. 11
Leveling ................................................................................................... 11
Air Requirements ................................................................................... 11
Unconfined Space .................................................................................. 11
Confined Space ..................................................................................... 11
Fresh Air Openings for Confined Spaces .......................................... 11
Outdoor Air Through Two Openings ...................................................12
Outdoor Air Through One Opening ....................................................12
Outdoor Air Through Two Horizontal Ducts .......................................12
Outdoor Air Through Two Vertical Ducts ...........................................12
Air From Other Indoor Spaces............................................................13
Termination Clearances Sidewall Power Vent ...................................14
Termination Clearances Sidewall Direct Vent ....................................15
VENTING .....................................................................................................16
Special Installation Considerations .......................................................16
General Exhaust Vent Installation Procedure ....................................16
Connecting Vent to Boiler ....................................................................16
Venting Supports ....................................................................................17
Vertical Installation Requirements ........................................................17
This design complies with the current edition of the ANSI
Z21.13 low-pressure boiler standard.
Compliance under this standard implies that when the boiler
underwent test, the gas manifold and control assembly pro vided
on the boiler met safe lighting and other performance criteria.
Detailed installation diagrams are found in this manual. These
diagrams will serve to provide the installer a reference for the
materials and methods of piping necessary. It is essential that
all water, gas piping and wiring be installed as shown on the
diagrams. You should thoroughly read and understand this
manual before installation and/or operation of this boiler.
The factory warranty will be void if the boiler(s) have been
improperly installed or operated.

CONTENTS

.......................................................16
®

INTRODUCTION

Horizontal Installtion Requirements ......................................................17
Direct Vent Installation Requirements .................................................19
MASSACHUSETTS .....................................................................................19
SYSTEM INSTALLATION ..........................................................................22
General ....................................................................................................22
Hot Water Heating (Hydronic) Equipment ..........................................22
Internal Contaminants ............................................................................23
Hard Water Conditions ..........................................................................23
Thermal Expansion (Closed System) ..................................................23
Remote Probe Installation Procedure .................................................23
Gas Connections ...................................................................................24
Gas Supply Line Sizing ........................................................................24
Wiring ......................................................................................................28
SUGGESTED PIPE SIZING TABLES .....................................................29
WIRING DIAGRAM ....................................................................................30
VB/VW-500, 750 & 1000 SCHEMATIC DIAGRAM ...............................32
OPERATION ................................................................................................33
Important .................................................................................................33
General ....................................................................................................33
Filling Hot Water Supply Boiler Installation .......................................33
Purging Gas Line ..................................................................................33
Inlet Gas Pressure ................................................................................33
Water Temperature Regulation .............................................................34
LIGHTING & OPERATION INSTRUCTIONS ..........................................36
Adjustment ..............................................................................................37
Setting of the Test Mode .....................................................................37
Control System .......................................................................................37
Inputs to MCB .......................................................................................38
Operating Sequence ..............................................................................39
UIM Operating Procedures ...................................................................40
Operating Setpoint Adjustment Procedure ..........................................41
TROUBLESHOOTING IGNITION SYSTEM ............................................44
Troubleshooting Gas Valve ...................................................................45
Main Burner ............................................................................................45
PREVENTATIVE MAINTENANCE .............................................................45
Relief Valve ............................................................................................46
Combustion Air Filter .............................................................................46
Blower Compartment .............................................................................46
Burner Maintenance ...............................................................................46
Condensate Removal System ..............................................................46
Venting Maintenance .............................................................................47
Heat Exchanger Preventative Maintenance ........................................47
Deliming ..................................................................................................47
Replacement Parts ................................................................................47
NOTES .........................................................................................................48
LIMITED WARRANTY ................................................................................51
AL 29-4C
is a registered trademark of Allegheny Ludlum
®
Corporation.
In addition to these instructions, the boiler(s) shall be installed in
accordance with those installation regulations in force in the local
area where the installation is to be made. These shall be carefully
followed in all cases. Authorities having jurisdiction should be
consulted before installations are made.
In the absence of local codes, the installation must comply with
the current editions, as follows:
In the United States:
The National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the
National Electric Code, NFPA 70.
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

200201Vw-500, vw-750Vw-1000Vf vb 1000Vf vb 750

Table of Contents