The router's AC power supply includes the following features:
Autoselects either 110V or 220V operation.
All units include a 6-foot (1.8-meter) electrical power cord. (A label near the power cord
indicates the correct voltage, frequency, current draw, and power dissipation for the
unit.)
Warning
protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15A U.S.
(240 VAC, 10A international) is used on the phase conductors (all current-carrying
conductors). (To see translated versions of this warning, refer to the appendix "Translated
Safety Warnings.")
The Cisco 2524 offers a direct current (DC) power supply. See the section "DC Power
Specifications" in the chapter "Installing the Cisco 2524 and Cisco 2525 Routers" for more
information.
Installation Checklist
The Installation Checklist lists the procedures for initial hardware installation of a new
router. Make a copy of this checklist and mark the entries as you complete each procedure.
Include a copy of the checklist for each system in your Site Log. (See the next section,
"Creating a Site Log.")
2-6 Cisco 2524 and Cisco 2525 Router User Guide
This product relies on the building's installation for short-circuit (overcurrent)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2524 - Router - EN and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

2525

Table of Contents