Applying Ac Power - Allied Telesis AT-9408LC/SP Installation Manual

At-9400 series gigabit ethernet switches
Hide thumbs Also See for AT-9408LC/SP:
Table of Contents

Advertisement

Chapter 2: Installing the Switch

Applying AC Power

62
To apply AC power to the switch, perform the following procedure:
1. Position the power cord retaining clip in the up position, as shown in
Figure 26.
Figure 26. Power Cord Retaining Clip in the Up Position
2. Plug the power cord into the AC power connector on the back panel of
the unit (see Figure 27).
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
Warning: This unit might have more than one power cord. To
reduce the risk of electric shock, disconnect all power cords
before servicing the unit.
.
Figure 27. Connecting the AC Power Cord
1 0 0 - 2
4 0 V A
~
C
E30
1 0 0 - 2
4 0 V A
~
C
E3

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF