Using The Rapid Deployment Pack; Connecting Server Blades - HP Rx2620-2 - Integrity - 0 MB RAM User Manual

Rapid deployment pack windows edition user guide 3.70
Hide thumbs Also See for Rx2620-2 - Integrity - 0 MB RAM:
Table of Contents

Advertisement

Using the Rapid Deployment Pack

2
This section provides information about the following topics:

Connecting server blades

Creating a reference server and image
Deploying a captured image to other similar servers
Reconfiguring the new servers
Maintaining server blades with rip-and-replace
Performing a Boot from SAN installation
Connecting server blades
Connect the enclosure to the network that contains your Deployment Server, and power up the
1.
enclosure.
Insert the server blades into the enclosure, but do not power on the server blades.
2.
Change the default rack and enclosure names.
3.
Power up the server blades.
4.
Open the Deployment Server Console to view target servers available for deployment and
5.
management. The following panes appear in the console:
Computers—This pane is located on the upper-left side of the console and displays, by
default, New Computers and All Computers. Virtual Machines and Physical Devices are also
displayed (if enabled).
Jobs—This pane is located on the lower-left side of the console and lists the jobs provided
with the Rapid Deployment Pack.
Details—This pane is located on the right side of the console and displays details for the
selections highlighted within the Computers pane or the Jobs pane.
Using the Rapid Deployment Pack 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Rx2620-2 - Integrity - 0 MB RAM and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Proliant essentials rapid deployment pack

Table of Contents