Download Print this page

Kenmore 2718 - High Efficiency 3.1 cu. Ft. Capacity Coin Op Front Load Washer Installation & Use Manual page 6

Coin- operated commercial tumble action washer

Advertisement

UNPACKING
7.
1.
Cut the shipping carton along the dotted line along the base
of the unit.
8.
2.
While in the carton carefully lay the washer on its back
side.
3.
Removethe styrofoam base.
4.
Carefully return the washer to an upright position and remove
the carton.
5.
Carefully move the washer to within 4 feet (122cm) of the
final location.
6.
Remove the following from the back side of the washer:
3 bolts,
3 yellow plastic spacers,
2 or 3 metal "P" clamps.
Remove the service panel from the front of the washer.
Remove the 4 nuts and 6 large washers that attach the 2
yellow shipping braces to the drum and the base. Lift up on
the drum and remove the braces (a yellow ribbon surrounds
the items to be removed). These braces must be removed
to allow the power supply cord to be released from the
shipping ring.
®
©
BOLT
P" CLAMP
g.
10.
11.
/
//
/
Remove the large styrofoam block located under the drum.
Lift up on the drum, tilt the base of the foam block inwards
toward the rear of the washer until free, then pull it out.
Remove and discard the yellow ribbon and label from the
front of the washer.
From the rear of the washer, carefully pull out the power
supply cord through the hole in the backsheet.
12. Replace the service panel and screws.
NOTE: If the washer is to be transported at a later date, the
shipping support hardware must be reinstalled to prevent
shipping damage.

Advertisement

loading

This manual is also suitable for:

2718 3.1