Clearances To Combustible Materials - Drolet DB05130 Manual

Drolet wood stove owner' manual model db05130
Table of Contents

Advertisement

CLEARANCES TO COMBUSTIBLE MATERIALS

It is of utmost importance that the clearances to combustible material mentioned on your wood stove
certification plate be scrupulously respected upon installation.
Model
Baron 2000sp
Baron 2000sp
with enveloppe
Compak
Contempro 1600
Contempro 2000
Gemini 1200
Gemini 1500
ML
RC
Nordic
Sawman
Whistler, DLX
Single Pipe / Double
Classic
16" (406mm) / 12" (305mm)
* Height, from stove base to ceiling.
You may decrease these clearances by installing heat radiation shields between the walls or the ceiling and
the stove. These heat radiation shields must be installed permanently, and can include sheet metal, a rigid
non-combustible sheet or a masonry wall. The installation standards of such heat radiation shields are listed
on the following page.
IT IS STRICTLY FORBIDDEN TO PLACE WOOD WITHIN THE MINIMUM CLEARANCES.
CLEARANCES
Back Wall
24" / 610 mm
15" / 381 mm
16" / 406 mm
12" / 305 mm
12" / 305 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
Single Pipe / Double
Pipe
22" (559mm) / 22" (559mm)
Side Walls
16" / 406 mm
26,5'' / 673mm
16" / 406 mm
24" / 610 mm
24" / 610 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
30" / 762 mm
16" / 406 mm
Single Pipe / Double
Pipe
11" (279mm) / 11" (279mm)
Corners
16" / 406 mm
26,5'' / 673mm
16" / 406 mm
15" / 381 mm
15" / 381 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
16" / 406 mm
30" / 762 mm
16" / 406 mm
Pipe
* Height
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7' / 2,13 m
7

Advertisement

Table of Contents
loading

Table of Contents