Gas Connection - Dometic Elite RM7732 Installation & Operating Instructions Manual

Automatic energy selector refrigerator for lp/gas and electric operation
Hide thumbs Also See for Elite RM7732:
Table of Contents

Advertisement

A. Install the lower front strip by maneuvering it under
the bottom hinge plates, as shown in FIG. 7.
FIG. 7
FIG. 7
FIG. 7
FIG. 7
FIG. 7
B. Secure the refrigerator and the lower front strip with two
screws: One screw through each hinge. See FIG. 8.
FIG. 8
FIG. 8
FIG. 8
FIG. 8
FIG. 8
STEP 2:
STEP 2:
STEP 2:
STEP 2:
STEP 2: Install the two screws in the top frame
Install the two screws in the top frame
Install the two screws in the top frame
Install the two screws in the top frame.
Install the two screws in the top frame
A. The top decoration panel must be removed from the
refrigerator before the screws can be installed.
Open refrigerator and freezer doors and remove the
two screws that secure decorator panel to top
frame. See FIG. 9.
B. Carefully tilt the top decoration panel and lift up to
remove from top frame. See FIG. 9.
FIG. 9
C. Install the second two screws in the top frame as
shown in FIG. 10, and replace decoration panel,
being careful to not pinch wires.
FIG. 10
STEP 3: Two screws installed in the rear base.
STEP 3: Two screws installed in the rear base.
STEP 3: Two screws installed in the rear base.
STEP 3: Two screws installed in the rear base.
STEP 3: Two screws installed in the rear base.
See FIG. 11
FIG. 11
Failure to follow the sequence in securing refrigerator
Failure to follow the sequence in securing refrigerator
Failure to follow the sequence in securing refrigerator
Failure to follow the sequence in securing refrigerator
Failure to follow the sequence in securing refrigerator
in the enclosure can cause leakage between the frame
in the enclosure can cause leakage between the frame
in the enclosure can cause leakage between the frame
in the enclosure can cause leakage between the frame
in the enclosure can cause leakage between the frame
and cabinet.
and cabinet.
and cabinet.
and cabinet.
and cabinet.

8. GAS CONNECTION

Hook up to the gas supply line is accomplished at the
manual gas shutoff valve, which is furnished with a 3/8"
SAE (UNF 5/8" – 18) male flare connection. A backup
wrench must be used when tightening the gas supply line.
All completed connections should be checked for leaks
with a noncorrosive leak detector. (See FIG. 12 – Gas
Shut-Off Valve may have a different orientation than
shown).
DO NOT USE A FLAME
DO NOT USE A FLAME
DO NOT USE A FLAME
DO NOT USE A FLAME
DO NOT USE A FLAME
TO CHECK FOR GAS LEAKS.
TO CHECK FOR GAS LEAKS.
TO CHECK FOR GAS LEAKS.
TO CHECK FOR GAS LEAKS.
TO CHECK FOR GAS LEAKS.
5
Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents