Download Print this page

Field Controls 46244900 Manual page 2

Thermocouple junction block

Advertisement

INSTALLATION
CAUTION: Shut off gas supply before working on appliance.
1. Remove thermocouple from gas control valve. (See Figure 1)
2. Thread the junction block into the thermocouple port and thread the
thermocouple into the bottom of the junction block. DO NOT over
tighten the junction block. Hand tread the block into thermocouple
port then tighten lightly with a wrench.
3. Mount the two (2) spill switches onto the draft hood so the switches
do not contact any metal. (See Figure 2)
4. Connect the one terminal of each switch with 12 ga wire and then connect it to the
thermocouple junction block. Next,connect the two remaining terminals together using a
short length of 12 ga wire. (See Figure 3)
5. Route and secure the wires to the water heater enclosure with acceptable hold down
tabs, keeping the wires away from any hot surface area.
SYSTEM CHECK-OUT PROCEDURE FOR GAS SPILLAGE SWITCH CONTROL
1. Shut off gas supply to appliance(s).
2. Block the flue pipe above the draft hood or draft diverter.
3. Re-establish gas supply to appliance and re-light pilot.
4. Adjust thermostat to call for heat.
5. Flue gases should be emitting from draft diverter or
draft hood. Note the location of the most flue gas
spillage. Allow approximately 2 minutes for the system
to back up and the gas burner to shut down. Wait 2 to 3
minutes, reset switches, and re-light pilot. If the spillage
switch does not trip within the 2 minute period, relocate
the switch onto the area where the observed highest
spillage occurred. Then perform this test again.
CAUTION: If for any reason the system has shut down
during normal operation, the cause of the system failure
should be investigated and corrected before resetting the
safety switch and relighting the pilot.
Page 2
Figure 1
Figure 2
Figure 3
P/N 46244900 Rev A 12/00

Advertisement

loading

This manual is also suitable for:

Tca-1