NOTE
1.
In case of the Pulley Motor installation, check if the
value of the Fig. 3-3-B is correct.
2.
When installing the Loading Motor PCB Ass'y, install it
correctly as Fig. 3-3-C.
3.
In case of the Loading Motor PCB Ass'y installation,
hook the wire on the Main Frame Ass'y as shown
Fig. 3-3-C.
Pulley Motor
Loading Motor
Safety surface for pressing
of the insert.
Rack Loading
Check Hook
Loading Motor PCB Ass'y
3-4: RACK LOADING/MAIN GEAR/PULLEY GEAR
(Refer to Fig. 3-4-A)
1.
Press down the catcher (1) and slide the Rack Loading.
2.
Unlock the support (2) and remove the Pulley Gear.
3.
Remove the Main Gear.
Pulley Gear
Main Gear
(2)
(1)
NOTE
1. In case of the Rack Loading installation, do not mesh it
to the Main Gear as shown the Fig. 3-4-B.
Rack Loading
Main Gear
DISASSEMBLY INSTRUCTIONS
7.0 ± 0.1mm
Fig. 3-3-B
The Lever should be position
between A and B.
A
B
Fig. 3-3-C
Rack Loading
Main Frame Ass'y
Fig. 3-4-A
Check Hook
Fig. 3-4-B
3-5: CLAMPER ASS'Y (Refer to Fig. 3-5-A)
1.
Press the Clamper and rotate the Clamper Plate
clockwise, then unlock the 3 supports (1).
2.
Remove the Clamper Plate, Clamper Magnet and
Clamper.
Clamper Plate
Clamper Magnet
NOTE
1. In case of the Clamper Ass'y installation, install
correctly as Fig. 3-5-B.
Clamper Plate
Clamper
3-6:
TRAVERSE HOLDER/INSULATOR (F)/INSULATOR
(R) (Refer to Fig. 3-6-A)
1.
Remove the Traverse Holder.
2.
Remove the 2 Insulator (F).
3.
Remove the Insulator (R).
Main Chassis Ass'y
Insulator (F)
Traverse Holder
NOTE
1.
In case of the Insulator (F) installation, install correctly
as Fig. 3-6-B.
2.
In case of the Insulator (R) installation, install correctly
as Fig. 3-6-C.
B3-2
Main Frame
(1)
(1)
Clamper
(1)
No gap
Insulator (R)
Insulator (F)
Insulator (F)
Traverse Holder
Fig. 2-5-A
Fig. 3-5-B
Fig. 3-6-A
Fig. 3-6-B