If you want to select all the objects in a container, select Import sub-containers also in the
Browse Identity Vault dialog box.
3 Click Continue on the Import Dialog to import all the objects into Designer.
4 Repeat
Step 1
through
You can edit the LDIF objects from the LDIF container. Go to the Outline View, expand the Identity
Vault, then double-click the LDIF container.
IMPORTANT: You should back up your project by using a version control system or export it to a
file.

3.2 Staging

You should ensure that all the applications and Identity Manager systems are up and running in the
next stage before moving the configurations.
1 Back up the current stage project to reuse it in the next stage:
1a In Designer, go to Windows >Show View > Project.
1b Right-click the current stage project and select Copy Project.
1c Enter the name for the next stage project, then click OK.
1d Click Finish.
Step 3
for all the Identity Vaults in your projects.
Staging a Project