Staging a Project
3
This section contains the following information:
Section 3.1, "Prerequisites," on page 17
Section 3.2, "Staging," on page 19
Section 3.3, "Post-staging," on page 22
3.1 Prerequisites
Ensure that the following general prerequisites are met before attempting the staging:
All the stages have the same version of eDirectory, Identity Manager, and Identity Manager
drivers.
Designer 3.5 or later is present.
Same workspace is used for all the stages.
All the applications and drivers are fully developed and tested in one stage before moving them
to the next stage.
From your project, gather information about the objects that are not modeled by Designer. For
more information, see
Create an LDIF file for all the objects that are not modeled by Designer. Use Designer to
import the additional objects.
Section 2.4, "Objects That Designer Does Not Model," on page
3
13.
Staging a Project
17
Need help?
Do you have a question about the IDENTITY MANAGER 3.6.1 - STAGING BEST PRACTICES GUIDE 2010 and is the answer not in the manual?