Cleveland 24CGP10 NAT Operation Installation Maintenance Manual

Gas steam boiler & convection steamer with easy timer

Advertisement

Quick Links

Visit www.clevelandrange.com to locate a
service or sales representative in your area.
SteamCraft Power 10
Gas Steam Boiler & Convection Steamer with
Easy Timer
Operation, Installation & Maintenance Manual
This manual is updated as new information and models are released. Visit our website for the latest manual.
MODEL:
24CGP10
!
Read the manual thoroughly.
Improper installation, operation or
maintenance can cause property
damage, injury, or death.
For your future reference.
Model #
Serial #
0
Cleveland
Part # KE004039-2 Rev D
February 2024

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 24CGP10 NAT and is the answer not in the manual?

Questions and answers

Summarization of Contents

Chapter 1: General Information and Safety
Laws, Codes, and Regulations
Details national and local codes, regulations, and safety standards for installation.
Gas Leak Instructions
Provides crucial safety precautions and actions to take in case of a gas leak.
Operational Safety
Outlines minimum safety policies and procedures for operating Cleveland Range appliances.
Inspection for Shipping Damage
Instructions for reporting and addressing any suspected shipping damage to the appliance.
Chapter 2: Product Information
Product Information Overview
Overview of the SteamCraft Power 10, its features, and available options.
Model Numbers and Serial Numbers
Explains how to identify the appliance's model and serial numbers for service.
Product Information Plate
Details the information found on the appliance's product information plate.
Product Views and Dimensions
Illustrates the steamer with dimensional views and clearances for installation.
Chapter 3: Installation Procedure
Select a Location
Guidance on choosing a suitable installation location, considering weight, leveling, and clearances.
Exhaust Hood Requirements
Specifies ventilation and exhaust hood requirements for safe gas-fired appliance operation.
Positioning and Leveling the Steamer
Instructions for correctly positioning the appliance and leveling it using adjustable legs.
Install Slide Racks (Pan Racks)
Step-by-step guide on how to install the internal slide racks for holding pans.
Install Free Air Vented Drain Lines
Critical instructions for installing drain lines, emphasizing free air venting and gravity flow.
Install Gas Supply Lines
Requirements and procedures for connecting the gas supply, including testing.
Install Electric Power Lines
Guidelines for safely connecting the electrical power supply, grounding, and wiring.
Water Supply Requirements and Installation
Details water quality, pressure, and connection requirements for optimal steamer performance.
Installation Checklist
A comprehensive checklist to ensure all installation tasks are completed correctly.
Chapter 4: Cooking Procedure
Cooking Procedure Steps
Step-by-step instructions for preparing and cooking food using the steamer.
Chapter 5: Easy Timer Operating Instructions
Main External Power Switch Operation
Procedure for turning on the main external power switch and initial steam generator startup.
Inspect Cooking Compartment
Guidance on inspecting the cooking compartment and drain screen for cleanliness and blockages.
Power On and Automatic Fill
Describes the automatic filling process of the steam generator when the unit is powered on.
Timed Mode Operation
Instructions for setting cooking times and using the 'SURE COOK' feature in timed mode.
Mode Switching: Timed to Manual
Procedure for switching the timer mode from TIMED to MANUAL operation.
Mode Switching: Manual to Timed
Procedure for switching the timer mode from MANUAL to TIMED operation.
Descale Notification
Information about the 'DESCALE' notification and how it appears after operational hours.
Reset Descale Notification
Steps to reset and clear the 'DESCALE' notification from the digital display.
Program Descale Notification Hours
Procedure to program the number of hours before the descaling notification is displayed.
Lighting and Shutdown Instructions
Detailed instructions for lighting the burners and safely shutting down the steamer.
Preheating the Steamer
Guidance on preheating the steamer for optimal cooking performance.
Chapter 6: Shutdown and Cleaning Procedures
Boiler Blowdown Procedure
Explanation of the automatic blowdown process and guidelines for blowdown frequency.
Shut Down and Daily Cleaning
Daily procedures for powering off, cooling, and cleaning the steamer compartment and components.
Chapter 7: Operating Tests and Checkout
Burner Ignition Test
Test procedure to verify the automatic pilot and burner ignition system.
Startup Procedure (De-Energized)
Steps for a safe startup procedure, ensuring all components are checked before energizing.
Boiler Drain and Rinse Cycle Inspection
Procedure to inspect the automatic blowdown cycle and check for plumbing leaks.
Operating Test Procedures
Tests to verify the proper operation of the steamer's steaming cycle and controls.
Chapter 8: Preventative Maintenance
General Maintenance Information
Overview of maintaining the appliance for optimal working condition and longevity.
Maintenance and Service Records
Importance of keeping detailed records of all maintenance, service, and repair activities.
Daily Maintenance Tasks
Daily tasks including blowdown and cleaning the interior and exterior of the appliance.
Weekly Maintenance Tasks
Weekly tasks focusing on cleaning drain screens and lines to prevent blockages.
Monthly Maintenance Tasks
Monthly task of descaling the steam generator to prevent scale buildup.
Yearly Maintenance Tasks
Annual task of cleaning the water line strainers to ensure proper water flow.

Table of Contents