Install Blower Pipes (Pb-413T) - Echo PB-413H - 02-09 Operator's Manual

Power blower
Table of Contents

Advertisement

PB-413T
WARNING
Never perform maintenance or assembly procedures with engine
running or serious personal injury may result.
INSTALL BLOWER PIPES
1. Assemble clamps (A) onto both ends of flexible pipe (B).
2. Assemble straight pipe with swivel (C) into flexible pipe (B).
NOTE
Assure throttle cable is not twisted before installing handle.
3. Loosen knob (G) on handle (D). Install handle onto straight pipe
with swivel (C).
4. Position throttle linkage so cable passes between the elbow (F) and
frame and runs along the top of the flexible pipe. Assemble flexible
pipe (B) to elbow (F) on blower.
NOTE
A light lubricant may be used to ease assembly of flexible pipe to
blower elbow.
5. Tighten clamps (A).
6. Install cable tie (E) in second groove of flexible pipe.
7. Move handle (D) to desired position. Tighten knob (G) hand tight.
8. Assemble straight pipe (H) to pipe with swivel (C), turning straight
pipe clockwise to lock in place. Assemble curved pipe (J) to straight
pipe (H) the same way.
9. Make sure all clamps are tight.
P
B
OWER
LOWER
O
'
M
PERATOR
S
ANUAL
B
A
B
C
D
F
A
E
A
D
H
G
B
C
13
A
G
B
C
J

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb-413t - 02-09Pb-413hPb-413t

Table of Contents