Download Print this page
HEIDENHAIN EBI 1135 EnDat22 Mounting Instructions

HEIDENHAIN EBI 1135 EnDat22 Mounting Instructions

Pwm/ats - adjusting and testing software, mounting wizard

Advertisement

Quick Links

PWM / ATS A
Anbauassistent für ExI 11xx
Mounting wizard for ExI 11xx
Assistant au montage pour l‘ExI 11xx
Assistente per il montaggio per ExI 11xx
Asistente para el montaje para ExI 11xx
T
S
Mounting Instructions
Istruzioni di montaggio
ECI 1118
EQI 1125
EQI 1130
ECI 1118
EQI 1128
EQI 1130
ECI 1118
EBI 1135
1/2017

Advertisement

loading
Need help?

Need help?

Do you have a question about the EBI 1135 EnDat22 and is the answer not in the manual?

Questions and answers

Summarization of Contents

PWM 20 Mounting Inspection Setup
HEIDENHAIN PWM/ATS Software and Encoder Compatibility
Identifies the PWM/ATS software and lists compatible HEIDENHAIN encoder models for mounting inspection.
Critical Safety Precautions
Emphasizes that mounting and commissioning require qualified specialists adhering to local safety regulations.
Mounting Inspection Procedure Steps
PWM 20 Components for Mounting Inspection
Details the components of the PWM 20 system used for mounting inspection.
Connect Encoder and Input ID Number
Connect the encoder to the device and input its ID number into the software for recognition.
Perform Exl Check and Analyze Scanning Gap
Select 'Exl check' and evaluate the signal amplitude to ensure proper scanning gap.
Assess Mounting Quality
Evaluate the mounting quality based on the results of the scanning gap check.
Align Encoder Position via Datum Shift
Use the 'datum shift' feature to precisely align the encoder's mechanical position.
Monitor Status, Errors, and Log Results
View system status, errors, and save detailed measurement results in the log file.
Finalize Mounting Inspection
Conclude the inspection process by selecting 'End' and disconnecting the test cable.