Advertisement

GPON OLT Products User Manual
FD1604S/FD1608S/FD1616S
---Device Install Guide
Version:V3.0
Shenzhen C-Data Technology Co., Ltd.
Marketing@cdatatec.com
+86-755-26014509
www.cdatatec.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FD1608S and is the answer not in the manual?

Questions and answers

Summarization of Contents

Instruction and Preparation
Document Scope, Revision History, and Precautions
Covers manual scope, revision details, and essential precautions for safe usage.
Pre-Installation Preparation Overview
Details on device appearance, interface, and power requirements before installation.
Hardware Overview: Front Panel
OLT Front Board Port Descriptions
Explains uplink, PON, and management ports on the front panel of the OLT.
LED Status Indicators
Details the meaning of various LED indicators for power, system, ports, and management.
Hardware Overview: Rear Panel and Power
Rear Panel Features
Describes rear panel components like grounding terminals and power module options.
Power Requirement Specifications
Specifies voltage ranges and conditions for DC and AC power supply.
Equipment Grounding Guidelines
Provides instructions for proper equipment grounding for safety and reliability.
Environmental Requirements and Installation
Place Design Requirements
Defines environmental conditions for optimal OLT operation, including temperature and humidity.
3 Hardware Installation Steps
Guides through the process of unpacking, checking, and preparing for OLT installation.
OLT Installation Methods
3.3.1 Plane Stack Installation
Step-by-step instructions for installing the OLT on a flat surface.
3.3.2 Rack Installation
Procedure for mounting the OLT into a standard 19-inch rack.
Port and Connection Details
3.4.1 Uplink Port Configuration
Details on uplink port types, specifications, and connection methods.
3.4.2 PON Port Connection
Guidance on connecting GPON SFP modules and fiber optic cables to PON ports.
Ground and Management Port Connections
Instructions for connecting ground cables and management ports (Console/MGMT).
Access Methods
Console Access Setup
Details on using console cables and software for device configuration.
MGMT Access Setup
Information on connecting via the management port for network access.
Power Supply Connection
3.4.5.1 Connecting the AC Power Cable
Procedure for connecting AC power cables to the OLT for redundancy.
3.4.5.2 Connecting the DC Input Power Cable
Step-by-step guide for assembling and connecting DC input power cables.
OLT Working Status Checkout
Power and OLT Status Verification
Checks for power supply status, OLT power LED, and system status (SYS LED).
3.5.3 Network Management Checkout
Verifies connectivity and status of the network management interface.
Default Configuration Settings
Network and Console Parameter Configuration
Default IP address, subnet mask, gateway, and console parameters.
4.3 Default Username and Password
Provides the default login credentials for CLI access.
Appendix and Concluding Remarks
PON Port Specifications
Details PON port attributes like transmission distance, wavelength, and sensitivity.
Business Capabilities and Environment
Outlines device capabilities, working environment, and company contact information.

Table of Contents