Download Print this page

Advertisement

Quick Links

ERBESI S.r.l.
Via Roma 53
33048 Chiopris Viscone UD Italy
T +39 0432 991327
F +39 0432 991083
www.erbesi.it
NIDO/MOLLY/TATINO
CHARLY/LUCKY
Istruzioni di montaggio
IMPORTANTE: CONSERVARE PER FUTURI RIFERIMENTI
LEGGERE ATTENTAMENTE
SI CONSIGLIA DI CONTROLLARE ACCURATAMENTE TUTTI GLI ELEMENTI PRIMA DEL MONTAGGIO E DI SEGUIRE ATTENTAMENTE LE ISTRUZIONI.
LA DITTA SI RISERVA DI NON SOSTITUIRE GRATUITAMENTE EVENTUALI ARTICOLI MONTATI NONOSTANTE CERTI ELEMENTI FOSSERO TROVATI
PRECEDENTEMENTE ROVINATI O IL DANNO FOSSE CAUSATO DA ERRATO MONTAGGIO O ERRATO UTILIZZO DEL PRODOTTO
IMPORTANT: KEEP FOR FUTURE REFERENCE
READ CAREFULLY
WE SUGGEST TO CONTROL CAREFULLY ALL ELEMENTS BEFORE THE ASSEMBLING AND TO FOLLOW CAREFULLY INSTRUCTIONS.
COMPANY WILL NOT SUBSTITUTE FOR FREE ITEMS ASSEMBLED EVEN IF ELEMENTS WERE FOUND BROKEN,
OR IF THE DAMAGE IS COUSED FROM WRONG ASSEMBLING OR WRONG USE OF THE ITEM

Advertisement

loading
Need help?

Need help?

Do you have a question about the LUCKY and is the answer not in the manual?

Questions and answers

Summarization of Contents

Istruzioni di montaggio
IMPORTANTE: CONSERVARE PER FUTURI RIFERIMENTI
Crucial instructions for future reference and careful reading of the assembly process.
LEGGERE ATTENTAMENTE
Instructions to be read carefully before and during assembly for proper product use.
Lista dei componenti - Parts List
Componenti lettino
List of crib components including headboards, footboards, and sides.
Componenti cassetto
List of drawer components like front, back, and side panels.
Ferramenta
Hardware parts list including screws, washers, nuts, and other fixings.
Attrezzi necessari
List of necessary tools required for the assembly process.
Assembly Steps
Step 1: Initial Frame Assembly
First step of assembly, connecting frame parts using specified components.
Step 2: Connecting Sides
Second step of assembly, connecting the main side panels of the crib.
Step 3: Mattress Base - LOW Position
Installing the mattress base in the lower position using specific hardware.
Step 4: Mattress Base - HIGH Position
Installing the mattress base in the higher position using specific hardware.
Step 5: Installing Sliding Siderail
Process for installing the sliding siderail mechanism.
Step 6: Securing Sliding Siderail
Ensuring the sliding siderail is properly secured in place.
Step 7: Safety Device for Sliding Siderail
Mounting the safety device on the sliding siderail for high mattress base position.
Step 8: Attaching Wheels and Drawer Runners
Attaching wheels and drawer runners to the crib structure.
Step 9: Drawer Hardware Assembly
Assembling the hardware components for the drawer.
Step 10: Drawer Assembly
Completing the assembly of the drawer unit.
Step 11: Inserting Drawer
Inserting the assembled drawer into the crib.
Step 12: Operating Sliding Siderail
Instructions on how to lower and raise the sliding siderail.
Smaltimento materiale di imballo
Disposal of packaging material
Guidelines for proper disposal of packaging materials and the product itself.