Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Asco Manuals
Protection Device
570
Installation & operation manual
Asco 570 Installation & Operation Manual
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
page
of
16
Go
/
16
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Table of Contents
Unpacking and Installation
Unpacking and Preliminary Inspection
Handling Considerations
Storage
Location Considerations
Environment
Audible Noise
Service Clearances
Mounting
Warnings Defined
Model Number Configuration
Operating Environment
Line Side Versus Load Side Installation
Electrical Connections
Voltage Ratings and Power Source Configurations
Wire Connections
Overcurrent Protection
NEC® Considerations
Voltage Protection Rating
Circuit Ampacity Limitations
System Grounding and Bonding
Grounding Electrode
Neutral Connection
Parallel Connection / Wire Diagram
Installation Instructions
Product Installation
Suggested Circuit Breaker and Wire Size - Model 570/560
Dimensional Information - Model 570/560
Suggested Circuit Breaker and Wire Size - Model 575/565
Dimensional Information - Model 575/565
Monitoring Features
External Status Indicators (Standard)
Summary Alarm Contact (Standard)
Audible Alarm (Standard)
Single or Dual Transient Counter (Optional)
Test Feature (Optional)
Active Surge Monitor (Optional)
Troubleshooting/Servicing Maintenance
Troubleshooting
Servicing
Corrective Maintenance
Preventative Maintenance
Advertisement
Quick Links
Download this manual
Surge Protective Devices
Installation & Operation Manual
Model 570/575
Model 575
Model 570
Model 565
Model 560
Model 560/565
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 570 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Asco 570
Protection Device Asco 520 Installation, Operation And Maintenance Manual
Surge protective device (16 pages)
Protection Device Asco 510 Installation, Operation And Maintenance Manual
Surge protective device (16 pages)
Protection Device Asco 565 Installation & Operation Manual
Surge protective devices (12 pages)
Protection Device Asco 575 Installation & Operation Manual
(16 pages)
Protection Device Asco 560 Installation & Operation Manual
(16 pages)
Protection Device Asco 4900 Load Bank User Manual
(96 pages)
Protection Device Asco 4820 User Manual
(51 pages)
Protection Device Asco 400 Series Installation & Operation Manual
Surge protective devices (12 pages)
Protection Device ASCO 425 Installation & Operation Manual
400 series surge protective devices (12 pages)
Protection Device Asco 252 Application Manual
(2 pages)
Protection Device Asco 457 Installation & Operation Manual
Surge protective devices (24 pages)
Summarization of Contents
Unpacking and Installation
Unpacking and Preliminary Inspection
Inspect shipping crate and unit for damages before unpacking and installation.
Handling Considerations
Guidelines for handling units bolted to shipping pallets using forklifts or pallet jacks.
Storage
Recommendations for storing units in a clean, dry environment within specified temperature ranges.
Location Considerations
Environment and Safety
Covers operating environment, audible noise, service clearances, and safety warnings like DANGER.
Model Number Configuration
Model Number Structure
Explains the structure of the ASCO SPD model numbers, detailing various configuration options.
Electrical Connections
Safety and Compliance
Stresses installation by qualified personnel, NEC compliance, and lockout/tagout procedures.
Wiring and Protection
Covers voltage ratings, wire connections, overcurrent protection, and NEC guidelines for SPDs.
System Grounding and Bonding
Grounding Electrode Function
Describes the function of grounding electrodes in diverting surge currents to earth or back to the source.
Circuit Ampacity Limitations
Discusses UL investigation for product withstand capabilities against fault currents up to 200,000 AIC.
Neutral Connection
Neutral Connection Requirements
Emphasizes the necessity of a reliable neutral connection for proper and safe SPD operation.
Installation Instructions
General Installation Steps
Outlines steps for quality installation, including power removal, qualified personnel, and enclosure suitability.
Mounting and Wiring
Details mounting the unit, connecting wires (line, neutral, ground), and keeping conductors short.
Alarm Contacts and LED Status
Describes connection to summary alarm contacts and monitoring LED status for normal and abnormal operation.
Suggested Circuit Breaker and Wire Size
Model 570/560 Sizing
Provides suggested circuit breaker and wire sizes for Model 570/560 based on surge rating.
Model 575/565 Sizing
Provides suggested circuit breaker and wire sizes for Model 575/565 based on surge rating.
Dimensional Information
Model 570/560 Dimensions
Provides dimensional data and weight for Model 570/560 based on series, surge rating, and connection type.
Model 575/565 Dimensions
Provides dimensional data and weight for Model 575/565 based on model number and R56 type.
Monitoring Features
External Status Indicators
Describes the function of green 'OK' and red 'Service' LEDs for indicating SPD module status.
Summary Alarm Contact
Details the two sets of Form C relay contacts for remote indication of SPD module failure.
Audible Alarm
Explains the audible alarm activation for module replacement and the disable feature.
Test Feature
Describes the self-check feature to test individual fuse links and determine remaining protection percentage.
Troubleshooting and Servicing
Troubleshooting Steps
Guides on determining system voltage/phasing and contacting the factory for alarm conditions.
Servicing and Warranty
Information on the ten-year parts and five-year labor warranty and how to contact ASCO for assistance.
Corrective Maintenance
Guidance on repairing or replacing failed surge modules and inspecting other components.
Preventative Maintenance
Recommendations for periodic system inspections, cleaning, and connection checks for reliable performance.
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 570 and is the answer not in the manual?
Questions and answers