Nu-Air ES100 HRV Operating, Maintaining & Installing

Nu-Air ES100 HRV Operating, Maintaining & Installing

Heat recovery ventilator

Advertisement

P.O. Box 2758
Windsor, Nova Scotia, B0N 2T0
Phone: 902-798-2261
www.nu-airventilation.com
Email: nuair@nu-airventilation.com
Now Featuring the Nu-Air EZ System.
1. EZ Level suspension straps.
2. EZ Balance pressure ports to measure
and balance air flows.
ES SERIES
OPERATING, MAINTAINING & INSTALLING YOUR HEAT RECOVERY
VENTILATOR
FOR MODELS ES095 ERV, ES115 ERV, ES100, ES150, ES160, ES160E, ES170 AND ES210
MANUFACTURED MAY 2015 ONWARD
* LEAVE THIS DOCUMENT WITH THE HOMEOWNER
Specifications, dimensions and ratings may change without notice
.
as a result of ongoing product development and improvements
Rev. 6.7 January 2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ES100 HRV and is the answer not in the manual?

Questions and answers

Summarization of Contents

System Function and Operation
System Overview and Purpose
Explains the purpose of the HRV/ERV and its basic function.
Operating Modes Explained
Details the various modes of operation for the ventilation system.
Installation Guide
Pre-Installation Requirements
Lists necessary supplies and installer responsibilities before installation.
Installation System Options
Describes different methods for installing the HRV system.
Ducting and Hood Installation
Covers exterior ducting, weather hood placement, and installation.
Mounting and Noise Control
Provides guidance on mounting the unit and minimizing noise.
Ductwork Design Principles
Outlines best practices for designing and installing ductwork.
Condensate Drain Setup
Details the procedure for connecting the condensate drain assembly.
Furnace Interlock Configuration
Explains how to interlock the HRV with the furnace for optimal operation.
Airflow Balancing Procedures
Guides on how to balance air flows for system performance.
Controls and Wiring
ES Series 12 VDC Controls
Details the ES Series 12 VDC controls, including Tx, Mx, Lumina, and wiring.
24 VAC Controls Overview
Covers NAV-460 timer, Windsor Series, and other 24 VAC control options.
Status Indicators and Modes
Explains the meaning of status LEDs and their relation to operating modes.
Operation and Maintenance
Start-Up Sequence
Steps for initial system start-up and electrical connection.
Routine Maintenance Tasks
Covers regular maintenance of filters, fans, core, hoods, and ducts.
Annual Servicing Recommendations
Outlines requirements for yearly professional servicing.
Troubleshooting and Schematics
Common Issues and Solutions
Provides a guide to diagnosing and resolving common operational problems.
Electrical Schematics
Presents wiring diagrams for different ES series models.
Warranty Information
Product Warranty Terms
Details the warranty coverage, duration, and limitations for the HRV.
Service Record
Installation and Service Log
A section for recording installation details and service history.

Table of Contents