Sign In
Upload
Download
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Avtron Manuals
Test Equipment
2800
User manual
Avtron 2800 User Manual
Load bank
Hide thumbs
1
2
3
Table Of Contents
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
page
of
29
Go
/
29
Contents
Table of Contents
Bookmarks
Advertisement
Quick Links
1
Description
2
Operation
3
Maintenance
Download this manual
2000 Series Load Bank
User's Guide
Part Number: M a n u a l T o g g l e S w i t c h
Revision Date: November 2022 V3
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Need help?
Do you have a question about the 2800 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Avtron 2800
Test Equipment Avtron 2000 Series User Manual
Load bank (29 pages)
Test Equipment Avtron 2500 User Manual
Load bank (29 pages)
Test Equipment Avtron 2600 User Manual
Load bank (29 pages)
Test Equipment Avtron LPH400 Manual
Resistive load bank (24 pages)
Test Equipment Avtron LPH150S Instruction Manual
Compact ac load bank (81 pages)
Summarization of Contents
SAFETY CONSIDERATIONS
DESCRIPTION
Model Control Panel Functions
Details control panel components and functions specific to various Avtron 2000 series load bank models.
Load Bank Enclosure
Describes the physical construction, materials, and mounting options for the load bank enclosure.
INSTALLATION
Installation Preparation
Instructions for inspecting the load bank for damage before installation procedures begin.
Site and Airflow Requirements
Specifies ideal placement and critical airflow requirements to prevent overheating and ensure proper operation.
Power and Load Connections
Details electrical power source requirements and methods for connecting the load bank to the unit under test.
Grounding and Blower Motor Setup
Covers essential grounding procedures and options for connecting the blower motor power supply.
OPERATION
Load Bank Operating Procedures
Step-by-step guide for safely operating the load bank, including pre-operation checks and load application.
Single-Phase Operation Modes
Explains how to configure and operate the load bank for single-phase power supply using different connection modes.
MAINTENANCE
Daily Maintenance Checks
Essential daily tasks to ensure the load bank is functioning correctly and safely.
Scheduled Maintenance Intervals
Scheduled maintenance procedures and inspections required at specific intervals for optimal performance.
Parts Replacement Guide
Guidance on accessing and replacing components, and where to find the parts list.
Save PDF
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 2800 and is the answer not in the manual?
Questions and answers