2000 Series Load Bank
User's Guide
Part Number: M a n u a l T o g g l e S w i t c h
Revision Date: November 2022 V3

Advertisement

loading
Need help?

Need help?

Do you have a question about the 2600 and is the answer not in the manual?

Questions and answers

Summarization of Contents

SECTION I SAFETY CONSIDERATIONS
Safety Statement Meanings
Explains the significance of WARNING and CAUTION statements for user and equipment safety.
General Safety Practices
Covers grounding, airflow management, contact hazards, emergency shutdown, and maintenance precautions.
Installation Safety Compliance
Stresses customer responsibility for installation per electrical codes and heeding manual warnings.
SECTION II DESCRIPTION
General Overview and Control Panel
Introduces the Load Bank's purpose and the general arrangement of its control panel.
Model-Specific Controls
Details the specific controls and indicators for various Model series (2100/2200, 2400, 2500, 2600/2700, 2800/2900).
Enclosure, Cooling, and Protection
Describes the enclosure, airflow management, cooling system interlocks, and circuit protection.
WARNING - Screen Removal Hazard
Warns against operating with screens removed due to high voltage and rotating fan blade hazards.
SECTION III INSTALLATION
Pre-Installation Checks and Location
Inspect for damage, select a cool, well-ventilated location with clear airflow.
Airflow and Installation Hazards
Addresses recirculating air, clearance requirements, exhaust heat hazards, and special mounting.
Power Requirements and Load Connection
Details control power source, load connection methods, and current/kW calculation formulas.
Grounding and Blower Motor Connections
Covers grounding requirements, voltage limits, and blower motor power connection methods including 50 Hz operation.
SECTION IV OPERATION
Initial Operation Setup
Setting switches to OFF, grounding connections, and connecting power sources.
Load Test Execution
Procedures for starting generator, setting voltage, applying load, and monitoring results.
Post-Test Procedures and Shutdown
Residual heat removal, powering down the unit, and disconnecting power sources.
Single-Phase Operation Modes
Explains L1-L3 and L1/L2-L3 connection modes for single-phase power and associated warnings.
ESD PRECAUTIONARY GUIDELINES
ESD Sensitivity and Handling
Warns about ESD damage to components and provides general handling guidelines.
SECTION V MAINTENANCE
General Maintenance and Safety
Importance of maintenance for longevity and safety, requiring qualified personnel and power disconnection.
Daily Maintenance Checks
Daily tasks include checking airflow restrictions, screens, direction, and recirculation.
Periodic Maintenance and Parts
Three-month/500-hour checks, indicator lamp checks, and component access for parts replacement.
Loadbank Warranty
Warranty Coverage and Conditions
Two-year limited warranty against defects, with conditions on deployment and maintenance.
Warranty Claims and Procedures
How to contact Avtron for claims, the support process, and required documentation.
Exclusions and Limitations
Lists items not covered and limits warranty liabilities and remedies.