Download Print this page

Advertisement

2000 Series Load Bank
User's Guide
Part Number: M a n u a l T o g g l e S w i t c h
Revision Date: November 2022 V3

Advertisement

loading
Need help?

Need help?

Do you have a question about the 2500 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Safety Considerations
General Safety and Warnings
Covers general safety principles, warnings, and cautions for load bank operation.
Operational Safety Recommendations
Provides initial safety recommendations: grounding, bulb replacement, and manual review.
Emergency Shutdown and Hazard Avoidance
Details advanced safety points, emergency shutdown, and hazard avoidance strategies.
Installation Responsibility and Compliance
Highlights customer responsibility for installation codes and adherence to manual warnings.
Description
Model 2100/2200 and 2400 Control Overview
Details controls and indicators for Models 2100, 2200, and 2400.
Model 2500, 2600/2700, 2800/2900 Control Overview
Details controls and indicators for Models 2500, 2600, 2700, 2800, and 2900.
Enclosure and Additional Model Information
Describes the load bank enclosure and provides additional model-specific information and cautions.
Critical Operational Warnings
Provides critical warnings regarding safe operation, focusing on covers and fan blades.
Installation
Location and Airflow Considerations
Guidelines for selecting location and managing airflow for optimal load bank performance.
Airflow Restrictions and Power Requirements
Details airflow restrictions, critical warnings, and power requirements for installation.
Load Connection and Safety Precautions
Instructions for load connection, including formulas and warnings about cover removal.
Grounding and Blower Motor Connections
Essential guidance on proper grounding and blower motor connections for safe operation.
Frequency Operation Warnings
Provides warnings for 50 Hz operation, focusing on motor speed and voltage limits.
Operation
Load Bank Operation Basics and Initial Steps
Covers initial setup, cautions, and first steps for load bank operation.
Operating Procedures and Load Application
Details load application sequence, monitoring, and safe shutdown procedures.
Single-Phase Operation: L1-L3 Connection
Explains single-phase operation via L1-L3 connection, including configuration.
Single-Phase Operation: L1/L2-L3 Connection
Explains single-phase operation via L1/L2-L3 connection, including configuration.
Maintenance
Maintenance Overview and Daily Checks
Introduces maintenance and outlines daily inspection and cleaning procedures.
Periodic Maintenance and Parts Replacement
Details periodic maintenance tasks and parts replacement information.
Loadbank Warranty Information
Two-Year Limited Warranty Terms
Details terms and conditions of the two-year limited warranty against defects.
Warranty Exclusions and Limitations
Outlines warranty exclusions, limitations, and user remedies.
Save PDF